Project Details
Work Type Widen Roadway from 4 to 6 lanes
Phase Construction
Limits from east of US 301 to west of Falkenburg Road
Project Start May 2017
Length .96 miles
City
  • Brandon
  • Tampa
County
  • Hillsborough
Road
  • Adamo Dr
  • Brandon Blvd
  • SR 60
Construction Cost $21.1 million
Estimated Completion Late 2018
Contractor Pepper Contracting Services, Inc.
Contact Information
Construction Manager
Anna Geismar
813-975-3553
Anna.Geismar@dot.state.fl.us
Media Contact
Kris Carson
813-975-6060
Kristen.Carson@dot.state.fl.us
About

The Florida Department of Transportation's contractor, Pepper Contracting Services, Inc. is widening SR 60 (Adamo Drive) from east of US 301 to the west of Falkenburg Road in Brandon.

As part of this project, the contractor will be making the following improvements: 

  • widening the roadway to a six (6) lane divided road with medians
  • constructing a retention pond and adding a new drainage system
  • installing new sidewalks to both sides of the roadway 
  • and re-striping the roadway for bike lanes   

To meet current FDOT standards, some of the median openings will be changed. Left turns from eastbound and westbound SR 60 will be allowed at Currie Davis Drive, Phillip Lee Boulevard, and the Salvation Army Family Store. Left turns from westbound SR 60 will be allowed at Wayne Place.

Construction began May of 2017 and is expected to finish in late 2018. 

This project has been combined with the repaving of SR 60 between Falkenburg Road and Lake Kathy Drive (Project Number 434738-2-52-01) which was completed in December 2017.