Project Details
Work Type Widening
Phase Design
Limits From East of US 41 to West of CR 581 (Bellamy Brothers Blvd)
Length 8.5 miles
County
Road
Design Cost $6.8 million
ROW Cost $12.2 million
About

This project involves widening SR 52 (Schrader Hwy) from the existing two lane road to a four lane divided road. To minimize right of way acquisition and impacts to the Conner Preserve, the widening will generally occur to the north of the existing roadway. A 12 foot wide multi-use trail will be built along the north side of the road as well.  

The project is currently under design.  Construction is not funded at this time.

View Factsheet
Contact Information
Design Manager
Pia Cormier
813-975-6176
Pia.Cormier@dot.state.fl.us
Media Contact
Kris Carson
813-975-6060
Kristen.Carson@dot.state.fl.us
Lane Closures
  • There are no lane closures at this time.