Project Details
Work Type New Interchanges
Phase Design
Limits from south of Timberlane Rd to south of Lake Street
City
County
Road
Design Cost $6.2 million
About

This project will convert US 19 into a six lane controlled access roadway with two lane, one way frontage roads on each side.  New interchanges will be built at Klosterman Road and Mango Street.

This project is currently in design.  Construction is not funded at this time.   

View Factsheet
Contact Information
Design Manager
Elizabeth Winters
813-975-6169
Elizabeth.winters@dot.state.fl.us
Media Contact
Kris Carson
813-975-6060
Kristen.carson@dot.state.fl.us
Lane Closures
  • There are no lane closures at this time.