Project Details
Work Type New Interchanges
Phase Design
Limits From south of Timberlane Rd to south of Lake Street
City
County
Road
Design Cost $6.2 million
About

This project will convert US 19 into a six lane controlled access roadway with two lane, one way frontage roads on each side.  New interchanges will be built at Klosterman Road and Mango Street.

*Design is currently on hold.  Construction is not currently funded.

View Factsheet
Contact Information
Design Manager
Omar Chehab, P.E.
813-975-6468
Omar.Chehab@dot.state.fl.us
Media Contact
Kris Carson
813-975-6060
Kristen.carson@dot.state.fl.us
Closures
  • There are no closures at this time.