Project Details
Work Type Widening
Phase Design
Limits from Valrico Road to Dover Road
City
County
Road
Design Cost $3.8 million
ROW Cost $9.3 million
About

This project will widened SR 60 in eastern Hillsborough County to a six lane divided roadway with a buffered bike lane between Valrico Road and Dover Road.  The project will also include adding sidewalks where they do not already exist.  Right of way will be required for drainage ponds. 

The project is currently in design. Construction is not funded at this time.