Project Details
Work Type Widening
Phase Design
Limits From N of Sportsman Point to E Arlington Street
Length .6 miles
City
County
Road
Design Cost $1.3M
ROW Cost $4.2M
About

**View The Online Virtual Public Meeting Here: https://www.fdottampabay.com/us41-5/

The purpose of this project is to reconstruct and widen US 41 from the existing 2 lanes to a 4-lane road with median separation. It includes bike lanes and sidewalks and a new pond site.

The project is currently in the design phase. Construction is currently anticipated to begin in 2027. 

View Factsheet
Contact Information
Design Manager
Eyra Cash
813-975-6164
Eyra.Cash@dot.state.fl.us
Media Contact
Kris Carson
813-975-6060
Kristen.carson@dot.state.fl.us
Closures
  • There are no closures at this time.