EMERGENCY INFORMATION FDOT Emergency Travel Alert: For information on the current situation, please visit the following page - Alerts.

Project Details
Work Type Repaving
Phase Design
Limits from north of 15th Ave. to south of Bullfrog Creek
Length 8.5 miles
City
County
Road
Design Cost $4.1 million
About

This project will repave US 41 between 15th Ave and Bullfrog Creek in Apollo Beach in southern Hillsborough County. 

The intersection of US 41 and Big Bend Road will be reconstructed in concrete.  The asphalt roadway will be removed and replaced with more durable concrete.

In addition to the roadway improvements, a continuous sidewalk will be built on the west side of US 41. Sidewalk connections from bus stops to the nearest intersections will be added on the east side of the roadway as well.  

The project is currently being designed.  Construction is anticipated to begin in the summer of 2021.

View Factsheet
Contact Information
Design Manager
Charlie Xie
813-975-6287
Charlie.xie@dot.state.fl.us
Media Contact
Kris Carson
813-975-6060
Kristen.carson@dot.state.fl.us
Lane Closures
  • There are no lane closures at this time.