US 92 (4th St. N) Median Modifications from 30th Ave N. to 94th Ave N. 439401-1-52-01
Project Details
Work Type | Median Modifications |
---|---|
Phase | Construction |
Limits | from 30th Ave N. to 94th Ave N. |
Project Start | April 24, 2023 |
Length | 4 miles |
City | |
County | |
Road | |
Construction Cost | $7.1 million |
Estimated Completion | Summer 2024 |
Contractor | Preferred Materials |
About
This project includes extending left turn lane storage at nine signalized intersections and 15 left turn lanes at existing median openings along the corridor.
Some existing median openings will be modified, lengthening the left turn lane storage, and others will be closed. Additionally, nine mid-block pedestrian crossings will be built. The median closures and turn lane extensions will improve safety and traffic flow. The new crosswalks with pedestrian signals will allow pedestrians to cross US 92 (4th St. N) at designated locations more safely. U-turn locations are available throughout the corridor to access businesses.
Construction is underway and anticipated to be complete in summer 2024.
Contact Information
Project Information |
---|
Maddie Pfingsten
727-575-8334
roadwork@dot.state.fl.us
|
Media Contact |
Kris Carson
813-975-6060
Kristen.Carson@dot.state.fl.us
|
Closures
-
US 92 (4th Street N.) from 30th Avenue N. to 94th Avenue N.
Day lane closures (northbound and southbound): Monday, March 25 through Friday, March 29 from 7 a.m. to 4 p.m.