I-75/I-275 Collector-Distributor Roadway from County Line Road to SR 56 430573-2, 430573-3
Project Details
Work Type | New Road Construction |
---|---|
Phase | Design |
Limits | From South of County Line Road to SR 56 |
Length | 3.2 miles |
City | |
County | |
Road | |
Design Cost | $8.3 million |
About
This project will construct a 3-lane Southbound Collector-Distributor (CD) road system from the I-75/I-275 apex to the SR 56 southbound on-ramp to compliment Northbound CD road system in Wesley Chapel.
This includes:
- A new 2-lane Southbound on-ramp from the CD roadway to Southbound I-75 which will require widening the bridge over Cypress Creek.
- A new bridge over Cypress Creek for the southbound CD roadway
- A new fork of I-75/I-275 southbound
- A new bridge of Southbound I-275 over the CD road ramp to Southbound I-75
- New concrete barrier wall separation between I-75 Southbound mainline and the proposed Southbound CD roadway.
- A proposed ramp from the Southbound CD roadway to Southbound I-75.
The project is currently in the design phase and has been combined with FPN 430573-3.
Construction is anticipated to begin in 2026.
View Factsheet
Contact Information
Design Manager |
---|
Dinyar Sharifabad
(813) 975-6172
Dinyar.Sharifabad@dot.state.fl.us
|
Media Contact |
Kris Carson
(813) 975-6060
Kristen.Carson@dot.state.fl.us
|
Closures
- There are no closures at this time.