Project Details
Work Type New Interchange
Phase Design
Limits From north of SR 580 (Main Street) to Northside Drive
City
County
Road
Design Cost $8 million
ROW Cost $12 million
About

This project will change the existing six lane divided highway to a six lane controlled access roadway with one-way frontage roads in both directions parallel to US 19. 

An Interchange is planned midway between SR 580 and SR 586 (Curlew Road), just north of Boy Scout Rd.  

This interchange will accommodate U-turn movements between northbound and southbound frontage roads and serve as a pedestrian crossing. 

In addition to the interchange, pedestrians will have a dedicated underpass between Evans Rd. and Republic Dr.

Right of way will be acquired for storm water ponds.

The project is currently in design.

Construction is anticipated to begin in  2022.

View Factsheet
Contact Information
Design Manager
Liz Winters
813-975-6169
Elizabeth.Winters@dot.state.fl.us
Media Contact
Kris Carson
813-975-6060
Kristen.Carson@dot.state.fl.us
Lane Closures
  • There are no lane closures at this time.
Project Files