New Traffic Pattern Coming to US 301 and Big Bend Road in Riverview
New Traffic Pattern Coming to US 301 and Big Bend Road
Riverview, FL – Beginning this week, a new traffic pattern will shift all travel lanes on US 301 to the west side of the road and through the Big Bend Road (County Road 672) intersection in Riverview.
The new traffic pattern will provide two travel lanes on northbound and southbound US 301, allowing the next phase of construction to begin on the east side of the roadway. This traffic pattern will continue through the summer of 2027.
To avoid congestion and traffic delays, motorists may want to consider alternate routes (Gibsonton Drive and Sun City Center Boulevard). Drivers are reminded to slow down, stay alert, and drive safely through the work zone.
The Florida Department of Transportation (FDOT) is widening Big Bend Road (CR 672) between Simmons Loop and US 301 to a six-lane divided roadway and replacing the intersection’s existing asphalt pavement with a concrete surface at US 301 and Big Bend Road in Hillsborough County.
For more information on this project or to sign up for traffic alerts, visit FDOT Tampa Bay