Water Works Sidewalk Gap – Various Locations 452877-1
Project Details
Work Type | Pedestrian Enhancements |
---|---|
Phase | Design |
Limits | From East of Doyle Carlton Dr. to West of Tampa St. |
Length | 0.5 Mile |
City | |
County | |
Road | |
Design Cost | $400,717 |
About
The Water Works Sidewalk Gap project will enhance multi-modal connectivity by eliminating key sidewalk gaps within the Tampa Heights district along I-275 near Water Works Park.
A direct wide sidewalk connection from Tampa Street to Doyle Carlton Drive adjacent to the barrier-separated I-275 exit ramp and a Doyle Carlton Pedestrian Crossing South of I-275 will be added.
Construction is anticipated to begin in late 2024.
View Factsheet
Contact Information
Design Manager |
---|
David Guttenplan
813-975-6078
David.Guttenplan@dot.state.fl.us
|
Media Contact |
Kris Carson
813-975-6060
Kristen.Carson@dot.state.fl.us
|
Closures
- There are no closures at this time.