Project Details
Work Type Pedestrian Enhancements
Phase Design
Limits From East of Doyle Carlton Dr. to West of Tampa St.
Length 0.5 Mile
City
County
Road
Design Cost $400,717
About

The Water Works Sidewalk Gap project will enhance multi-modal connectivity by eliminating key sidewalk gaps within the Tampa Heights district along I-275 near Water Works Park.

A direct wide sidewalk connection from Tampa Street to Doyle Carlton Drive adjacent to the barrier-separated I-275 exit ramp and a Doyle Carlton Pedestrian Crossing South of I-275 will be added.

Construction is anticipated to begin in late 2024.

 

View Factsheet
Contact Information
Design Manager
David Guttenplan
813-975-6078
David.Guttenplan@dot.state.fl.us
Media Contact
Kris Carson
813-975-6060
Kristen.Carson@dot.state.fl.us
Closures
  • There are no closures at this time.