Project Details
Work Type Safety and Operational Improvements
Phase Construction
Project Start Summer 2025
City
County
Road
Construction Cost $114,500
Contractor Cone & Graham, Inc.
About

The Florida Department of Transportation's Design-Build Firm, Cone & Graham, Inc., is making operational and safety improvements to two Hillsborough County intersections:

  • SR 600 (US 92 Hillsborough Avenue) at N 47th Street
  • SR 45 (US 41 N Nebraska Avenue) at E 124th Avenue

Construction activities are expected to begin summer 2025.

*********************************************************************************

What is design-build? Design-build is a method of project delivery in which one entity - the design-build team - works under a single contract with the FDOT (or any owner) to fully design and construct a project.  The contract work covers from initial design through construction completion.  This contract type typically allows for faster construction of a project as design and construction can be on-going simultaneously. 

View Factsheet
Contact Information
Project Information
Maddie Griffin
727-575-8334
Maddie.Griffin@dot.state.fl.us
Media Contact
Kris Carson
813-975-6060
Kristen.carson@dot.state.fl.us
Closures
  • SR 674 (W Martin Luther Jr. Boulevard) at N 12th Street 
    Lane Closures: Monday, March 9 through Friday, March 13 from 8 a.m. to 6 p.m.
    Night lane closures: Sunday, March 8 through Thursday, March 12 nights from 7 p.m. to 12 a.m.

Project Images
Upright and mast arm transport (February 2026 photo)
Wiring stoplights (February 2026 photo)
Assembling the mast arm (February 2026 photo)
Pouring cantilever ground mounted sign spread footing (February 2026 photo)
Grouting for structural support (February 2026 photo)
Flying upright at SW corner at southwest corner of MLK and 12th Street (February 2026 photo)
Forming the sidewalk, curb & gutter at the SW corner (February 2026 photo)
Newly installed sidewalk (January 2026 Photo)
Performing cleanup operation (January 2026 Photo)
Removing old sections of sidewalk, curb and gutter (January 2026 Photo)
Loading and hauling away concrete debris (January 2026 Photo)
Installing & tying in conduit runs at SW corner of Nebraska Avenue and E 124th Avenue (January 2026 Photo)
Backfilling conduit runs at SW corner of Nebraska Avenue and E 124th Avenue (January 2026 Photo)