EMERGENCY INFORMATION FDOT Emergency Travel Alert: For information on the current situation, please visit the following page - Alerts.

Project Details
Work Type SR 583 (56th/50th St) Corridor Study
Phase Completed
Limits from SR 618 (Selmon Expressway) to Fletcher Ave
Length 5.5 miles
City
County
Road
About

The SR 583 (56th/50th Street) Corridor Study was performed to evaluate possible changes to improve safety, operations, and connectivity along the corridor. The SR 583 corridor from Sligh Avenue to Busch Boulevard/Bullard Parkway was identified by the Hillsborough TPO as a Vision Zero corridor, meaning it was identified as a corridor with a high number of severe crashes leading to fatalities and incapacitating injuries. A primary focus of this corridor study was to identify safety solutions and countermeasures to improve the safety for all users.

View Factsheet
Contact Information
Media Contact
Kris Carson
813-975-6060
Kristen.Carson@dot.state.fl.us
Closures
  • There are no closures at this time.