Project Details
Work Type Widening
Phase Construction
Limits From Cobb Road to west of Buck Hope Road
Project Start April 3, 2023
Length 1.3 miles
City
County
Road
Construction Cost $15.8 million
Estimated Completion Summer 2025
Contractor PCS Civil, Inc.
About

This project has widened SR 50 (Cortez Boulevard) between Cobb Road and Buck Hope Road from four lanes to six lanes. The intersection of Cobb Road / W Jefferson Street / SR 50 has been rebuilt in concrete.

Other project improvements include milling and resurfacing the existing roadway, installing curb and gutter, drainage improvements, adding bicycle lanes, and building sidewalks.


PROGRESS UPDATE

All lanes are now open at SR 50 intersection and throughout the SR 50 project area!

July 18, 2025 - After opening the remaining lanes overnight at the SR 50 (Cortez Boulevard) / SR 50A (W Jefferson Street) / Cobb Road intersection, all lanes are now open throughout the project area. This includes the additional lanes on SR 50, with 3 thru lanes in each direction from the Cobb Road / Jefferson Street intersection to just west of Buck Hope Road.

Installation of signs, final roadway striping, and various work items remain to complete the project. Motorists are asked to drive within the posted speed limit and remain alert to workers and equipment. Periodic day and night lane closures will continue as needed to complete the construction activities through approximately August 2025.

View Factsheet
Contact Information
Project Information
John McShaffrey
813-975-6930
john.mcshaffrey@dot.state.fl.us
Media Contact
Kris Carson
813-975-6060
Kristen.Carson@dot.state.fl.us
Closures
  • There are no closures at this time.
Project Files
Project Images
Eastbound on SR 50A (Jefferson Street at the SR 50 (Cortez Blvd.) / Cobb Road intersection (7-21-2025 photo)
Eastbound on SR 50 (Cortez Blvd.) approaching the Good Neighbor Trail bridge over the roadway (7-21-2025 photo)
Looking south over SR 50 (Cortez Blvd.) from the Good Neighbor Trail bridge (7-21-2025 photo)
Looking south over SR 50 (Cortez Blvd.) from the Good Neighbor Trail bridge (7-21-2025 photo)
Eastbound on SR 50 (Cortez Blvd.) west of Buck Hope Road (7-21-2025 photo)
Looking north on SR 50 (Cortez Blvd.) west of Buck Hope Road (7-21-2025 photo)
Northbound on SR 50 (Cortez Blvd.) approaching the Cobb Road / SR 50A (Jefferson St). intersection (7-21-2025 photo)
Looking north from SR 50 (Cortez Blvd.) towards the Good Neighbor Trail bridge over the roadway (7-21-2025 photo)
Looking north from SR 50 (Cortez Blvd.) at the Good Neighbor Trail bridge over the roadway (7-21-2025 photo)
Looking north from SR 50 (Cortez Blvd.) to Cobb Road (7-21-2025 photo)
Looking north from SR 50 (Cortez Blvd.) to Cobb Road (7-21-2025 photo)
Looking north from SR 50 (Cortez Blvd.) to Cobb Road (7-21-2025 photo)
Looking northeast at the SR 50 (Cortez Blvd.) / Cobb Road / SR 50A (Jefferson Street) intersection (7-21-2025 photo)
Storm water pond almost complete at SR 50 (Cortez Blvd.) next to the Good Neighbor Trail bridge (7-21-2025 photo)
Work at the Cortez Blvd. / Cobb Rd. /W Jefferson Street to open additional lanes (6-6-2025 photo)
Looking south over SR 50 from the Cobb Road / Jefferson Street intersection (4-15-2025 photo)
Looking south over SR 50 from south of  W Jefferson Street to south of Sheriff Mylander Way (4-15-2025 photo)
Looking east over SR 50 from Horse Lake Road to past Emerald Springs Way (4-15-2025 photo)
Looking east over SR 50 from Horse Lake Road to past Emerald Springs Way (4-15-2025 photo)
Looking east over SR 50 from west of Candlelight Boulevard to Buck Hope Road (4-15-2025 photo)
Looking east over SR 50 from west of Buck Hope Road to east of US 41 (4-15-2025 photo)
Asphalt base for concrete paving on Cortez Blvd near the Cobb Rd / W Jefferson St intersection (January 2025 photo)
Looking west at asphalt base paving on Cortez Blvd near the Cobb Road / W Jefferson Street intersection (January 2025 photo)
Looking south at concrete paving on Cortez Blvd south of the Cobb Road / W Jefferson Street intersection (January 2025 photo)
Looking north at concrete paving on Cortez Blvd near the Cobb Road / W Jefferson Street intersection (January 2025 photo)
Looking south over Cortez Blvd at Sheriff Mylander Way (January 2025 photo)
Looking southwest over Cortez Boulevard at Horse Lake Road (January 2025 photo)
Looking east over Cortez Blvd towards Candlelight Boulevard (January 2025 photo)
Widening in the median of Cortez Blvd approaching Candlelight Blvd. (7-2-2024 photo)
Widening in the median of Cortez Blvd near Candlelight Blvd. (7-2-2024 photo)
Northbound on Cortez Blvd near Emerald Springs Way (7-2-2024 photo)
Looking north on Cortez Blvd from Donto Way. (7-2-2024 photo)
Looking north towards the Cobb Road / W Jefferson Street intersection from Cortez Blvd. (7-2-2024 photo)
Looking north at the Cobb Road / W Jefferson Street intersection  from Cortez Blvd. (7-2-2024 photo)
Grading the roadway on Cobb Road to prepare for concrete paving (5-4-2023 photo)
Looking south on SR 50 (Cortez Blvd) at the temporary traffic pattern approaching Sheriff Mylander Way (5-4-2023 photo)
Roadway widening on the outside of SR 50 (Cortez Blvd) at Horse Lake Road (5-4-2023 photo)
Roadway widening on the outside of SR 50 (Cortez Blvd) approaching Buck Hope Road (5-4-2023 photo)
Removing the median traffic separator (April 2023 photo)
Installing striping for a traffic shift (April 2023 photo)
Placing temporary asphalt for a traffic shift (April 2023 photo)
Placing and grading temporary roadway base (April 2023 photo)
Installing temporary traffic detection equipment (April 2023 photo)
Grading temporary roadway base (April 2023 photo)
Constructing a temporary drainage top (April 2023 photo)
Placing temporary asphalt for traffic shift (4-21-2023 photo)
Barrels line the median where work is beginning to rebuild the SR 50/Cobb Rd./Jefferson St. intersection in concrete (4-19-2023 photo)
Looking south on eastbound SR 50 (Cortez Blvd.) at work in the median (4-19-2023 photo)
Compacting roadway base material in the median of SR 50 (Cortez Blvd. (4-19-2023 photo)