Henry Canal Drainage Improvement from Hesperides Street to Lois Avenue 422929-6-52-01
Project Details
Work Type | Drainage Improvement |
---|---|
Phase | Design |
Limits | from Hesperides Street to Lois Avenue |
City | |
County | |
Design Cost | $278,000 |
About
The project will re-grade and stabilize the canal slopes along the Henry Canal between Hesperides Street and Lois Avenue. Activities in this contract will resolve the slope stability and erosion issues along the drainage canal.
The project is currently in design.