Project Details
Work Type Resurfacing with Concrete Intersection upgrade
Phase Completed
Limits from north of Ingram St. to north of Lamar Avenue
Length 1.86 miles
City
County
Road
About

All construction activities associated with this project were completed and accepted from the contractor by FDOT on December 2, 2022. 

This project resurfaced US 41 (Broad St) between Ingram Street and Lamar Avenue.  As part of the project, the intersection of US 41 and Wiscon Road was rebuilt using concrete.  New raised concrete medians were constructed at multiple locations along the corridor.

View Factsheet
Contact Information
Media Contact
Kris Carson
813-975-6060
kristen.carson@dot.state.fl.us
Closures
  • There are no closures at this time.
Project Files
Project Images
Looking south on US 41 at new concrete near Wiscon Road
Looking north on US 41 where new asphalt and concrete sections meet
New pavement markings on the new concrete section of the roadway
New pavement markings on the new concrete section of the roadway
Asphalt finished with fresh pavement markings
Project nearing completion as shown in this final alignment of US 41 (May 2022 photo)
US 41 repaved and marked for final alignment (May 2022 photo)
Placing forms for raised concrete separator in median of US 41 (May 2022 photo)
Paving a turnout onto US 41 (May 2022 photo)
Paving operation (May 2022 photo)
New US 41 concrete roadway and traffic separator (May 2022 photo)
Completed asphalt turnout onto the new concrete section of US 41 (May 2022 photo)
Building roadway base in the median of US 41 (11/4/2021 photo)
A milling machine is waiting for a dump truck to remove and load old pavement (11/4/2021 photo)
Roadway reconstruction in the US 41 median (11/4/2021 photo)
Fresh asphalt is rolled on southbound US 41. Concrete will be placed over this base for the final roadway surface. (8/27/2021 photo)
Fresh asphalt is rolled on southbound US 41. Concrete will be placed over this base for the final roadway surface. (8/27/2021 photo)
Fresh asphalt is rolled on southbound US 41. Concrete will be placed over this base for the final roadway surface. (8/27/2021 photo)
Workers pave a base layer of asphalt on southbound US 41 just south of Wiscon Road. Concrete will be placed over this area for the final roadway surface (8/27/2021 photo)
Workers pave a base layer of asphalt on southbound US 41. Concrete will be placed over this area for the final roadway surface (8/27/2021 photo)
Workers pave a base layer of asphalt on southbound US 41. Concrete will be placed over this area for the final roadway surface (8/27/2021 photo)