Project Details

Work Type Capacity Improvements
Phase Completed
Limits from north of I-4 to north of US 92 (Hillsborough Ave)
Length 2.5 miles
City
County
Road

About

All construction activities associated with this project were completed on Wednesday, March 5, 2025. 

Click to view the I-275 Virtual Open House Tour

The $96.7 million capacity improvement project added one lane in each direction to I-275 from north of I-4 to north of Hillsborough Avenue (US 92) using the existing right-of-way.

Other improvements: constructed noise barrier walls along the corridor, installed fencing and Intelligent Transportation System (ITS) devices, and reconstructed the overpasses between Floribraska Avenue and Hillsborough Avenue. 

*Construction cost included original construction contract amount plus approved contract changes. It did not include inspection oversight.

View Factsheet The link target will open in a new tab.

Contact Information

Media Contact
Kris Carson
813-975-6060
Kristen.Carson@dot.state.fl.us

Archived Project Files

Project Videos

Project Images

I-275 Capacity Improvements (March 2025)
I-275 Capacity Improvements (March 2025)
I-275 Capacity Improvements (March 2025)
I-275 Capacity Improvements (March 2025)
I-275 Capacity Improvements (February 2025)
I-275 Capacity Improvements (February 2025)
I-275 Capacity Improvements (February 2025)
I-275 Capacity Improvements (January 2025)
I-275 Capacity Improvements (January 2025)
I-275 Capacity Improvements (January 2025)
I-275 Capacity Improvements (January 2025)
I-275 Capacity Improvements (January 2025)
I-275 Capacity Improvements (January 2025)
I-275 Capacity Improvements (January 2025)
I-275 Capacity Improvements (December 2024)
I-275 Capacity Improvements (December 2024)
I-275 Capacity Improvements (December 2024)
I-275 Capacity Improvements (December 2024)
I-275 Capacity Improvements (December 2024)
I-275 Capacity Improvements (December 2024)
I-275 Capacity Improvements (December 2024)
I-275 Capacity Improvements (November 2024)
I-275 Capacity Improvements (November 2024)
I-275 Capacity Improvements (November 2024)
I-275 Capacity Improvements (November 2024)
I-275 Capacity Improvements (September 2024)
I-275 Capacity Improvements (September 2024)
I-275 Capacity Improvements (September 2024)
I-275 Capacity Improvements (September 2024)
I-275 Capacity Improvements (August 2024)
I-275 Capacity Improvements (August 2024)
I-275 Capacity Improvements (August 2024)
I-275 Capacity Improvements (August 2024)
I-275 Capacity Improvements (August 2024)
I-275 Capacity Improvements (August 2024)
I-275 Capacity Improvements (August 2024)
I-275 Capacity Improvements (July 2024)
I-275 Capacity Improvements (July 2024)
I-275 Capacity Improvements (July 2024)
I-275 Capacity Improvements (July 2024)
I-275 Capacity Improvements (June 2024)
I-275 Capacity Improvements (June 2024)
I-275 Capacity Improvements (June 2024)
I-275 Capacity Improvements (June 2024)
I-275 Capacity Improvements (June 2024)
I-275 Capacity Improvements (May 2024)
I-275 Capacity Improvements (May 2024)
I-275 Capacity Improvements (May 2024)
I-275 Capacity Improvements (May 2024)
I-275 Capacity Improvements (May 2024)
I-275 Capacity Improvements (May 2024)
I-275 Capacity Improvements (May 2024)
I-275 Capacity Improvements (May 2024)
I-275 Capacity Improvements (May 2024)
I-275 Capacity Improvements (April 2024)
I-275 Capacity Improvements (April 2024)
I-275 Capacity Improvements (April 2024)
I-275 Capacity Improvements (April 2024)
I-275 Capacity Improvements (April 2024)
I-275 Capacity Improvements (April 2024)
I-275 Capacity Improvements (April 2024)
I-275 Capacity Improvements (March 2024)
I-275 Capacity Improvements (March 2024)
I-275 Capacity Improvements (March 2024)
I-275 Capacity Improvements (March 2024)
I-275 Capacity Improvements (March 2024)
I-275 Capacity Improvements (February 2024)
I-275 Capacity Improvements (February 2024)
I-275 Capacity Improvements (February 2024)
I-275 Capacity Improvements (February 2024)
I-275 Capacity Improvements (February 2024)
I-275 Capacity Improvements (February 2024)
I-275 Capacity Improvements (January 2024)
I-275 Capacity Improvements (January 2024)
I-275 Capacity Improvements (January 2024)
I-275 Capacity Improvements (January 2024)
I-275 Capacity Improvements (January 2024)
I-275 Capacity Improvements (January 2024)
I-275 Capacity Improvements (January 2024)
I-275 Capacity Improvements (January 2024)
I-275 Capacity Improvements (January 2024)
I-275 Capacity Improvements (January 2024)
I-275 Capacity Improvements (January 2024)
I-275 Capacity Improvements (January 2024)
I-275 Capacity Improvements (January 2024)
I-275 Capacity Improvements (December 2023)
I-275 Capacity Improvements (December 2023)
I-275 Capacity Improvements (December 2023)
I-275 Capacity Improvements (December 2023)
I-275 Capacity Improvements (December 2023)
I-275 Capacity Improvements (December 2023)
I-275 Capacity Improvements (December 2023)
I-275 Capacity Improvements (December 2023)
I-275 Capacity Improvements (December 2023)
I-275 Capacity Improvements (December 2023)
I-275 Capacity Improvements (December 2023)
I-275 Capacity Improvements (December 2023)
I-275 Capacity Improvements (December 2023)
I-275 Capacity Improvements (November 2023)
I-275 Capacity Improvements (November 2023)
I-275 Capacity Improvements (November 2023)
I-275 Capacity Improvements (November 2023)
I-275 Capacity Improvements (November 2023)
I-275 Capacity Improvements (November 2023)
I-275 Capacity Improvements (November 2023)
I-275 Capacity Improvements (November 2023)
I-275 Capacity Improvements (October 2023)
I-275 Capacity Improvements (October 2023)
I-275 Capacity Improvements (October 2023)
I-275 Capacity Improvements (October 2023)
I-275 Capacity Improvements (October 2023)
I-275 Capacity Improvements (October 2023)
I-275 Capacity Improvements (October 2023)
I-275 Capacity Improvements (October 2023)
I-275 Capacity Improvements (October 2023)
I-275 Capacity Improvements (October 2023)
I-275 Capacity Improvements (October 2023)
I-275 Capacity Improvements (October 2023)
I-275 Capacity Improvements (October 2023)
I-275 Capacity Improvements (October 2023)
I-275 Capacity Improvements (October 2023)
I-275 Capacity Improvements (September 2023)
I-275 Capacity Improvements (September 2023)
I-275 Capacity Improvements (September 2023)
I-275 Capacity Improvements (September 2023)
I-275 Capacity Improvements (September 2023)
I-275 Capacity Improvements (September 2023)
I-275 Capacity Improvements (September 2023)
I-275 Capacity Improvements (September 2023)
I-275 Capacity Improvements (September 2023)
I-275 Capacity Improvements (September 2023)
I-275 Capacity Improvements (August 2023)
I-275 Capacity Improvements (August 2023)
I-275 Capacity Improvements (August 2023)
I-275 Capacity Improvements (August 2023)
I-275 Capacity Improvements (August 2023)
I-275 Capacity Improvements (July 2023)
I-275 Capacity Improvements (July 2023)
I-275 Capacity Improvements (July 2023)
I-275 Capacity Improvements (July 2023)
I-275 Capacity Improvements (July 2023)
I-275 Capacity Improvements (July 2023)
I-275 Capacity Improvements (July 2023)
I-275 Capacity Improvements (July 2023)
I-275 Capacity Improvements (July 2023)
I-275 Capacity Improvements (July 2023)
I-275 Capacity Improvements (June 2023)
I-275 Capacity Improvements (June 2023)
I-275 Capacity Improvements (June 2023)
I-275 Capacity Improvements (June 2023)
I-275 Capacity Improvements (June 2023)
I-275 Capacity Improvements (June 2023)
I-275 Capacity Improvements (June 2023)
I-275 Capacity Improvements (June 2023)
I-275 Capacity Improvements (May 2023)
I-275 Capacity Improvements (May 2023)
I-275 Capacity Improvements (May 2023)
I-275 Capacity Improvements (May 2023)
I-275 Capacity Improvements (May 2023)
I-275 Capacity Improvements (May 2023)
I-275 Capacity Improvements (May 2023)
I-275 Capacity Improvements (May 2023)
I-275 Capacity Improvements (May 2023)
I-275 Capacity Improvements (May 2023)
I-275 Capacity Improvements (April 2023)
I-275 Capacity Improvements (April 2023)
I-275 Capacity Improvements (April 2023)
I-275 Capacity Improvements (April 2023)
I-275 Capacity Improvements (April 2023)
I-275 Capacity Improvements (April 2023)
I-275 Capacity Improvements (April 2023)
I-275 Capacity Improvements (April 2023)
I-275 Capacity Improvements (April 2023)
I-275 Capacity Improvements (April 2023)
I-275 Capacity Improvements (April 2023)
I-275 Capacity Improvements (April 2023)
I-275 Capacity Improvements (April 2023)
I-275 Capacity Improvements (April 2023)
I-275 Capacity Improvements (March 2023)
I-275 Capacity Improvements (March 2023)
I-275 Capacity Improvements (March 2023)
I-275 Capacity Improvements (March 2023)
I-275 Capacity Improvements (March 2023)
I-275 Capacity Improvements (March 2023)
I-275 Capacity Improvements (March 2023)
I-275 Capacity Improvements (March 2023)
I-275 Capacity Improvements (March 2023)
I-275 Capacity Improvements (March 2023)
I-275 Capacity Improvements (March 2023)
I-275 Capacity Improvements (March 2023)
I-275 Capacity Improvements (February 2023)
I-275 Capacity Improvements (February 2023)
I-275 Capacity Improvements (February 2023)
I-275 Capacity Improvements (February 2023)
I-275 Capacity Improvements (February 2023)
I-275 Capacity Improvements (February 2023)
I-275 Capacity Improvements (February 2023)
I-275 Capacity Improvements (February 2023)
I-275 Capacity Improvements (February 2023)
I-275 Capacity Improvements (February 2023)
I-275 Capacity Improvements (February 2023)
I-275 Capacity Improvements (February 2023)
I-275 Capacity Improvements (February 2023)
I-275 Capacity Improvements (February 2023)
I-275 Capacity Improvements (February 2023)
I-275 Capacity Improvements (February 2023)
I-275 Capacity Improvements (February 2023)
I-275 Capacity Improvements (February 2023)
I-275 Capacity Improvements (February 2023)
I-275 Capacity Improvements (February 2023)
I-275 Capacity Improvements (February 2023)
I-275 Capacity Improvements (January 2023)
I-275 Capacity Improvements (January 2023)
I-275 Capacity Improvements (January 2023)
I-275 Capacity Improvements (January 2023)
I-275 Capacity Improvements (January 2023)
I-275 Capacity Improvements (January 2023)
I-275 Capacity Improvements (January 2023)
I-275 Capacity Improvements (January 2023)
I-275 Capacity Improvements (January 2023)
I-275 Capacity Improvements (January 2023)
I-275 Capacity Improvements (January 2023)
I-275 Capacity Improvements (January 2023)
I-275 Capacity Improvements (December 2022)
I-275 Capacity Improvements (December 2022)
I-275 Capacity Improvements (December 2022)
I-275 Capacity Improvements (December 2022)
I-275 Capacity Improvements (December 2022)
I-275 Capacity Improvements (December 2022)
I-275 Capacity Improvements (December 2022)
I-275 Capacity Improvements (December 2022)
I-275 Capacity Improvements (December 2022)
I-275 Capacity Improvements (November 2022)
I-275 Capacity Improvements (November 2022)
I-275 Capacity Improvements (November 2022)
I-275 Capacity Improvements (November 2022)
I-275 Capacity Improvements (November 2022)
I-275 Capacity Improvements (November 2022)
I-275 Capacity Improvements (November 2022)
I-275 Capacity Improvements (November 2022)
I-275 Capacity Improvements (October 2022)
I-275 Capacity Improvements (October 2022)
I-275 Capacity Improvements (October 2022)
I-275 Capacity Improvements (October 2022)
I-275 Capacity Improvements (October 2022)
I-275 Capacity Improvements (October 2022)
I-275 Capacity Improvements (October 2022)
I-275 Capacity Improvements (October 2022)
I-275 Capacity Improvements (October 2022)
I-275 Capacity Improvements (October 2022)
I-275 Capacity Improvements (October 2022)
I-275 Capacity Improvements (October 2022)
I-275 Capacity Improvements (October 2022)
I-275 Capacity Improvements (October 2022)
I-275 Capacity Improvements (October 2022)
I-275 Capacity Improvements (October 2022)
I-275 Capacity Improvements (October 2022)
I-275 Capacity Improvements (September 2022)
I-275 Capacity Improvements (September 2022)
I-275 Capacity Improvements (September 2022)
I-275 Capacity Improvements (September 2022)
I-275 Capacity Improvements (September 2022)
I-275 Capacity Improvements (September 2022)
I-275 Capacity Improvements (September 2022)
I-275 Capacity Improvements (September 2022)
I-275 Capacity Improvements (August 2022)
I-275 Capacity Improvements (August 2022)
I-275 Capacity Improvements (August 2022)
I-275 Capacity Improvements (August 2022)
I-275 Capacity Improvements (August 2022)
I-275 Capacity Improvements (August 2022)
I-275 Capacity Improvements (August 2022)
I-275 Capacity Improvements (August 2022)
I-275 Capacity Improvements (August 2022)
I-275 Capacity Improvements (August 2022)
I-275 Capacity Improvements (July 2022)
I-275 Capacity Improvements (July 2022)
I-275 Capacity Improvements (July 2022)
I-275 Capacity Improvements (July 2022)
I-275 Capacity Improvements (July 2022)
I-275 Capacity Improvements (July 2022)
I-275 Capacity Improvements (July 2022)
I-275 Capacity Improvements (July 2022)
I-275 Capacity Improvements (July 2022)
I-275 Capacity Improvements (July 2022)
I-275 Capacity Improvements (July 2022)
I-275 Capacity Improvements (July 2022)
I-275 Capacity Improvements (July 2022)
I-275 Capacity Improvements (July 2022)
I-275 Capacity Improvements (July 2022)
I-275 Capacity Improvements (June 2022)
I-275 Capacity Improvements (June 2022)
I-275 Capacity Improvements (June 2022)
I-275 Capacity Improvements (June 2022)
I-275 Capacity Improvements (June 2022)
I-275 Capacity Improvements (June 2022)
I-275 Soil Anchors & Lagging Wall Installation Looking South May 2022
I-275 MSE (Mechanically Stabilized Earth) Wall Installation Looking South May 2022
I-275 MSE (Mechanically Stabilized Earth) Wall Installation Looking North May 2022
I-275 Lagging Wall Looking South May 2022
Hillsborough Ave Overpass Lagging Wall Looking West May 2022
Hillsborough Ave Overpass Lagging Wall Looking East May 2022
Chelsea Street Overpass Concrete Sidewalk & Slope Pavement Looking East May 2022
Chelsea Street Overpass Concrete Sidewalk & Slope Pavement Looking West May 2022
I-275 Bridge Pier Drilled Shaft Looking West May 2022
I-275 Bridge Pier Drilled Shaft Looking North May 2022
I-275 Capacity Improvements (May 2022)
I-275 Capacity Improvements (April 2022)
I-275 Capacity Improvements (April 2022)
I-275 Capacity Improvements (April 2022)
I-275 Capacity Improvements (April 2022)
I-275 Capacity Improvements from north of I-4 to Hillsborough Ave (March 2022)
I-275 Capacity Improvements from north of I-4 to Hillsborough Ave (March 2022)
I-275 Capacity Improvements from north of I-4 to Hillsborough Ave (March 2022)
I-275 Capacity Improvements from north of I-4 to Hillsborough Ave (March 2022)
I-275 Capacity Improvements from north of I-4 to Hillsborough Ave (March 2022)
I-275 Capacity Improvements from north of I-4 to Hillsborough Ave (March 2022)
I-275 Capacity Improvements from north of I-4 to Hillsborough Ave (March 2022)
I-275 Capacity Improvements from north of I-4 to Hillsborough Ave (February 2022)
I-275 Capacity Improvements from north of I-4 to Hillsborough Ave (February 2022)
I-275 Capacity Improvements from north of I-4 to Hillsborough Ave (February 2022)
I-275 Capacity Improvements from north of I-4 to Hillsborough Ave (February 2022)
I-275 Capacity Improvements from north of I-4 to Hillsborough Ave (February 2022)
I-275 Capacity Improvements from north of I-4 to Hillsborough Ave (February 2022)
I-275 Capacity Improvements from north of I-4 to Hillsborough Ave (February 2022)
I-275 Capacity Improvements from north of I-4 to Hillsborough Ave (February 2022)
I-275 Capacity Improvements from north of I-4 to Hillsborough Ave (February 2022)
I-275 Capacity Improvements from north of I-4 to Hillsborough Ave (February 2022)
I-275 Capacity Improvements from north of I-4 to Hillsborough Ave (February 2022)
I-275 Capacity Improvements from north of I-4 to Hillsborough Ave (February 2022)
I-275 Capacity Improvements from north of I-4 to Hillsborough Ave (February 2022)
I-275 Capacity Improvements from north of I-4 to Hillsborough Ave (January 2022)
I-275 Capacity Improvements from north of I-4 to Hillsborough Ave (January 2022)
I-275 Capacity Improvements from north of I-4 to Hillsborough Ave (January 2022)
I-275 Capacity Improvements from north of I-4 to Hillsborough Ave (January 2022)
I-275 Capacity Improvements from north of I-4 to Hillsborough Ave (January 2022)
I-275 Capacity Improvements from north of I-4 to Hillsborough Ave (December 2021)
I-275 Capacity Improvements from north of I-4 to Hillsborough Ave (December 2021)
I-275 Capacity Improvements from north of I-4 to Hillsborough Ave (December 2021)
I-275 Capacity Improvements from north of I-4 to Hillsborough Ave (December 2021)
I-275 Capacity Improvements from north of I-4 to Hillsborough Ave (December 2021)
I-275 Capacity Improvements from north of I-4 to Hillsborough Ave (December 2021)
I-275 Capacity Improvements from north of I-4 to Hillsborough Ave (December 2021)
I-275 Capacity Improvements from north of I-4 to Hillsborough Ave (December 2021)
I-275 Capacity Improvements from north of I-4 to Hillsborough Ave (December 2021)
I-275 Capacity Improvements from north of I-4 to Hillsborough Ave (December 2021)
I-275 Capacity Improvements from north of I-4 to Hillsborough Ave (December 2021)
I-275 Capacity Improvements from north of I-4 to Hillsborough Ave (October 2021)
I-275 Capacity Improvements from north of I-4 to Hillsborough Ave (October 2021)
I-275 Capacity Improvements from north of I-4 to Hillsborough Ave (October 2021)
I-275 Capacity Improvements from north of I-4 to Hillsborough Ave (September 2021)
I-275 Capacity Improvements from north of I-4 to Hillsborough Ave (September 2021)
I-275 Capacity Improvements from north of I-4 to Hillsborough Ave (September 2021)
I-275 Capacity Improvements from north of I-4 to Hillsborough Ave (September 2021)
I-275 Capacity Improvements from north of I-4 to Hillsborough Ave (September 2021)