SR 573 (Dale Mabry) Repaving from Pinewood St. to Ballast Point Blvd. 443347-1-52-01
Project Details
Work Type | Repaving |
---|---|
Phase | Design |
Limits | from south of Pinewood St. to north of Ballast Point Blvd |
Length | 1.5 miles |
City | |
County | |
Road | |
Design Cost | $808,000 |
About
This project will repave Dale Mabry Hwy between Pinewood St. and Ballast Point Blvd. in south Tampa. In addition to repaving the road, the traffic signal at the intersection of Dale Mabry Hwy and Oklahoma Ave will be replaced with hurricane resistant poles.
Design activities are currently underway. Construction is anticipated to begin in 2024.