Work Type Urban Corridor Improvements
Phase Design
Limits from Kennedy Blvd to E. Arctic St.
Length 5.4 miles
City
County
Road
Design Cost $798,470
About

This project will add various pedestrian features along Nebraska Avenue between Kennedy Blvd and E. Arctic St. in Tampa.  These features include mid-block crossings, rectangular rapid flashing beacons, pedestrian signals, pedestrian refuge islands, pedestrian lighting and pedestrian hybrid beacon signals. 

The project is in the design phase.  Construction is anticipated to begin in 2023.

View Factsheet