EMERGENCY INFORMATION FDOT Emergency Travel Alert: For information on the current situation, please visit the following page - Alerts.

ACTIVE STATE OF EMERGENCY

As Florida continues to recover from Hurricane Helene, the Florida Department of Transportation (FDOT) is also actively monitoring Hurricane Milton.

Interstate lane closures and operations on active construction projects within the projected path of the storm have been suspended.

Contractors on these construction projects are currently securing work sites, clearing traffic control devices
that are not actively being used to direct traffic, and checking drainage systems.

Visit FloridaDisaster.org for the latest storm information and safety alerts.

For real-time traffic information throughout the state, visit FL511.com.

Project Details
Work Type Widening
Phase Design
Limits From south of Pendola Point /Madison Avenue to Denver Street
Length 1 mile
City
County
Road
Design Cost $1.5 million
ROW Cost $4.9 million
About

This project will include milling and resurfacing, widening, pavement markings, drainage improvements, pedestrian / bicyclist enhancements, signage, and a shared use path on the east side of the road.

This project is currently in the design phase. Right of way acquisition and construction are not funded at this time.

View Factsheet
Contact Information
Design Manager
Anh-Thu Nguyen
813-975-6197
Anh-Thu.Nguyen@dot.state.fl.us
Media Contact
Kris Carson
813-975-6060
Kristen.Carson@dot.state.fl.us
Closures
  • There are no closures at this time.