Project Details
Work Type Resurfacing, Traffic Signals, and Signing/Pavement Markings. Also included are associated drainage, ADA, and safety improvements.
Phase Design
Limits From south of Balm Rd./Paseo Al Mar Blvd. to south of Whitt Rd.
Length 4.771 Miles
City
County
Road
Design Cost $1.48M
About

The purpose of this Resurfacing, Restoration and Rehabilitation (RRR) project is to preserve and extend the life of the existing pavement through milling and resurfacing. This project also includes minor drainage work, roadway, and pedestrian safety improvements.

As a part of this project, FDOT is proposing to install a permanent directional median opening on US 301 at Cowley Road to reduce conflicts and improve safety conditions.

Construction is currently anticipated to begin in Fall 2024.

To learn more about this project, please visit: US 301 at Cowley Road (arcgis.com)

View Factsheet
Contact Information
Design Manager
Eyra Cash, P.E.
(813) 975-6164
Eyra.Cash@dot.state.fl.us
Media Contact
Kris Carson
(813) 975-6060
Kristen.Carson@dot.state.fl.us
Closures
  • There are no closures at this time.