SR 580/SR 600/US 92/HILLSBOROUGH AVE FROM BAY PATH LANE TO E OF TUDOR DR 255339-2-52-01
Project Details
Work Type | Wetland Mitigation/Restoration |
---|---|
Phase | Design |
Limits | SR 580/SR 600/US 92/Hillsborough Ave and the Tidal Canal |
Length | .212 Miles |
City | |
County | |
Road | |
Design Cost | $700,000 |
About
New wetland mitigation site that will include clearing and grubbing, grading and stabilization, installation of sediment barriers and floating turbidity barriers, removal of existing pavement, replacement of existing drainage structures, installation of high-performance turf mats, and plantings.
Construction is currently anticipated to begin in summer 2024.