Mondon Hill Road to be closed temporarily at US 98 / SR 50
Brooksville, FL -- Mondon Hill Road is scheduled to be closed at US 98 / SR 50 from 11 p.m. Wednesday, September 9 to 5 a.m. Monday, September 14 for concrete paving work at the intersection. The detours during the closure are listed below. Motorists are advised to plan a few extra moments into their schedules to travel the detour routes. The same closure is also scheduled from 11 p.m. Wednesday, September 16 to 5 a.m. Monday, September 21.
Detours:
- Eastbound SR 50 to northbound Mondon Hill Road – traffic will continue driving east to Raley Road, turn left at Raley Road, make a left at McAllister Street, make a left at Frank Court, make a right at Bertram Road, and make a right onto Mondon Hill Road.
- Westbound SR 50 to northbound Mondon Hill Road – prior to reaching Mondon Hill Road, traffic will turn right at Raley Road, make a left at McAllister Street, make a left at Frank Court, make a right at Bertram Road, and make a right onto Mondon Hill Road.
- Northbound Spring Lake Highway to Mondon Hill Road – traffic will turn right onto SR 50, turn left at Raley Road, make a left at McAllister Street, make a left at Frank Court, make a right at Bertram Road, and make a right onto Mondon Hill Road.
- Southbound Mondon Hill Road to eastbound and westbound SR 50 – traffic will make a left onto Bertram Road, left onto Frank Court, right onto McAllister Street, right onto Raley Road, and then proceed south to SR 50 to go either direction on SR 50.
For project information, click here.