Project Details
Work Type Widening and Resurfacing
Phase Design
Limits Alt US 19 from Tradewinds Drive to North of Curlew Road; Curlew Road from Alt US 19 to Bogie Lane
Length .845 Miles
City
County
Road
Design Cost $880,000
ROW Cost $141,000
About

This project will widen the intersection and approaching lanes at Alt US 19 and Curlew Road (SR 586) in Pinellas County. A left turn lane will be added on Curlew Road at Alt US 19, as well as a pedestrian crossing on Alt US 19 at Tradewinds Drive. Existing traffic signals and drainage will also be replaced at the Alt US 19/Curlew Road intersection.

This project is currently in the design phase. Construction is scheduled to begin in 2025.

 

View Factsheet
Contact Information
Design Manager
Eyra Cash
813-975-6164
Eyra.Cash@dot.state.fl.us
Media Contact
Kris Carson
813-975-6060
Kristen.Carson@dot.state.fl.us
Closures
  • There are no closures at this time.