Pinellas County All Current Projects
- 450609-1-58-01
- 62nd Ave S Bridge Replacement Over Maximo Channel
- 449208-1-52-01
- Alt U.S. 19 (Bay Pines Boulevard) Resurfacing from Hoover Boulevard/95th Street N to south of 53rd Avenue
- 451073-1-52-01
- Alt US 19 (Bayshore Boulevard) Safety Enhancements from Wilson Street to south of Curlew Road
- 451097-1-52-01
- ALT US 19 (N Missouri Avenue) at Rosery Road
- 437553-1-52-01
- Alt US 19 (N Myrtle Avenue) railroad crossing replacement between Hart Street and Maple Street
- 437710-1-52-01
- Alt US 19 (S Pinellas Avenue) Widening from Curlew Place to Country Club Court
- 451098-1-32-01
- Alt US 19 (Seminole Boulevard) Intersection Improvements at Walsingham Road
- 451096-1-32-01
- Alt US 19 (Seminole Boulevard/Missouri Avenue) Intersection Improvements at SR 686 (E Bay Drive/ W Bay Drive)
- 449166-1-52-01
- Alt US 19 (SR 595) Resurfacing from south of the Pinellas County Line to US 19
- 448486-1-52-01
- Alt US 19 Widening at SR 586 (Curlew Road) and SR 586 (Curlew Road) Repaving from Bogie Lane to Fisher Road
- 422904-2-52-01
- I-275 (Howard Frankland Bridge) new southbound bridge between Pinellas and Hillsborough counties
- 450586-1-52-01
- I-275 (Sunshine Skyway Bridge) Bridge Repair
- 451949-1-52-01
- I-275 (Sunshine Skyway Bridge) Water Main Improvements from north of Skyway Fishing Pier to south of Pinellas Point Drive
- 437805-1-52-01
- I-275 and US 19 Highway Lighting Upgrades in Pinellas County
- 454172-1-52-01
- I-275 Pavement Rehabilitation from north of I-375 to north of 38th Avenue North
- 449153-1-52-01
- I-275 Repaving from north of Maximo Point Bridges to south of 54th Avenue S
- 424501-7-52-01
- I-275 Widening from 54th Avenue S to I-375
- 449109-2-52-01
- I-275 Widening from I-375 to 38th Avenue
- 449109-1-52-01 & 444243-1-52-01
- I-275 Widening from north of 38th Avenue N to north of 4th Street N
- 445507-4-52-01
- I-75, I-275, and I-4, Wrong-way Detection Installation in Hillsborough, Pasco and Pinellas counties
- 454388-1
- Pinellas Bayway Multimodal Feasibility Study
- 457471-1
- Pinellas Park Transportation Talks
- 447236-1-52-01
- S.R. 686 (Roosevelt Boulevard) Pavement Reconstruction at 28th Street
- 451456-1-52-01
- SR 580 (Tampa Road) Resurfacing from east of St. Petersburg Drive to Silvermill Drive
- 452125-1-52-01
- SR 586 (Curlew Road) Drainage Improvements from Countryside Boulevard to Tampa Road
- 452125-2-52-01
- SR 586 (Curlew Road) Drainage Improvements from US 19 to Countryside Boulevard
- 448041-1-52-01
- SR 586 (Curlew Road) Repaving from Bogie Lane to Fisher Road
- 405600-2-52-71
- SR 590 (14th Avenue S) Pedestrian Mid-Block Crosswalk at 7th Street S in Pinellas County
- 445681-1-52-01
- SR 590 (Drew Street) Repaving from Osceola Avenue to US 19
- 447918-1-52-01
- SR 60 (Gulf to Bay Boulevard) Resurfacing from east of Old Coachman Road to Dr Kiran Patel Boulevard
- 454711-1
- SR 60 Corridor Study from Shore Drive to Rocky Point Drive
- 437498-1-52-01
- SR 60 Courtney Campbell Causeway Pedestrian Overpass
- 455192-1
- SR 60/Courtney Campbell Causeway PD&E Study
- 254677-6-41
- SR 682 (Pinellas Bayway) New Traffic Signal at Dolphin Cay Lane/Landings Drive in Pinellas County
- 254677-6-42
- SR 682 (Pinellas Bayway) Toll Plaza Removal and Roadway Improvements
- 449205-1-52-01
- SR 686 (East Bay Drive) Repaving from Highland Avenue to west of Belcher Road
- 440247-1-52-01
- SR 686 (Roosevelt Boulevard) Repaving from US 19 to Lightwave Drive
- 456060-1-52-01
- SR 687 (4th Street N) Repaving from 106th Avenue N to 119th Avenue N
- 444244-1
- SR 687 (4th Street North) Shared Use Path from SR 694 (Gandy Boulevard) to I-275
- 254677-6-17
- SR 688 (Ulmerton Road) from 49th Street to I-275 Lighting Retrofit
- 441654-1-52-01
- SR 688 (Walsingham Road) Repaving from SR 699 (Gulf Boulevard) to Indian Rocks Road/Oakhurst Road
- 447921-1-52-01
- SR 688 (Walsingham Road/Ulmerton Road) Resurfacing from east of Indian Rocks Road to east of 119th Street North
- 454839-1-54-01
- SR 694 (Park Boulevard) New Traffic Signal at 60th Street in Pinellas County
- 449213-1-52-01
- SR 699 (Blind Pass Road) Repaving from north of 75th Avenue to north of W Gulf Boulevard
- 456312-2-52-01
- SR 699 (Gulf Boulevard) Repairs from SR 682 (Pinellas Bayway) to SR 688 (Walsingham Road)
- 443666-1-52-01
- SR 699 (Gulf Boulevard) Repaving from 191st Avenue to SR 688 (5th Avenue N)
- 435914-2-52-01
- US 19 Interchange Improvement at SR 694 (Gandy Boulevard/Park Boulevard)
- 256774-3-52-01
- US 19 New Interchanges and Roadway Improvements from SR 580 to the north of CR 95
- 433799-1-52-01
- US 19 New Interchanges between CR 95 and Pine Ridge Way S
- 433796-1-52-01
- US 19 New Interchanges between Timberlane Road and Lake Street
- 433797-1-52-01
- US 19 New Interchanges from Nebraska Avenue to Timberlane Road
- 456054-1-52-01
- US 19 Repaving from 49th Street to SR 580 (Main Street)
- 451287-1-52-01
- US 19 Repaving from South of Tampa Road to South of Live Oak Street
- 447919-1
- US 92 (4th Street N) Repaving from 3rd Street N to 30th Avenue N
- 445668-1-52-01
- US 92 (Gandy Boulevard) ITS Improvements from the Gandy Bridge to Dale Mabry Highway
- 451238-1-52-01
- US 92 (Gandy Boulevard) Resurfacing from Brighton Bay Boulevard to Gandy Bridge