Pasco County Sidewalk Gaps – Various Locations 450970-1-52-01
Project Details
Work Type | Sidewalk |
---|---|
Phase | Design |
Limits | 1) Land O’ Lakes Blvd from north of Gator Lane to north of Causeway Blvd. and 2) SR 54 from east of Northpointe Pkwy to east of Hackberry Sq |
Length | 0.846 miles |
City | |
County | |
Road | |
Design Cost | $293,000 |
About
The purpose of this project is to construct a concrete sidewalk at two locations:
- A 6-foot-wide sidewalk on the west side of US 41 (Land O' Lakes Boulevard) from north of Gator Lane to Sabal Palm Court.
- A 5-foot-wide sidewalk on the north side of SR 54 from east of Bexley Village Drive to west of Crestbend Boulevard.
Construction is anticipated to begin in summer 2025.
View Factsheet
Contact Information
Design Manager |
---|
Bronoris Pye
813-975-6096
Bronoris.Pye@dot.state.fl.us
|
Media Contact |
Kris Carson
813-975-6060
Kristen.carson@dot.state.fl.us
|
Closures
- There are no closures at this time.