Launch Recite Me assistive technology

EMERGENCY INFORMATION FDOT Emergency Travel Alert: For information on the current situation, please visit the following page - Alerts.

Florida Department of
TRANSPORTATION

449166-1-52-01
Alt US 19 (SR 595) Resurfacing from south of the Pinellas County Line to US 19
454110-1-12-01
Ayers Road Extension Feasibility Study
439832-5-52-01
CR 52/Meridian Avenue/21st Street/Suwanee Way/St. Joe Road
449400-1-52-01
CR 54 Resurfacing from CR 581/Bruce B. Downs Boulevard to East of Curley Road
257298-3-52-01
CR 578 (County Line Road) from east of East Road to Spring Time Street
257298-7-52-01
CR 578 (County Line Road) from east of Mariner Blvd to west of Suncoast Parkway
449142-1-52-01
I-275/I-75 Resurfacing from Hillsborough County Line to CR 54
455991-1-52-01
I-75 (SR 93) Interchange Improvement at CR 54
454668-1-52-01
I-75 at SR 52 Interchange Improvements
453551-1-52-01
I-75 Florida Regional Advanced Mobility Elements (FRAME) from Hillsborough to Hernando counties
454499-1-52-01
I-75 Resurfacing from north of S.R. 52 to Hernando County Line
445507-4-52-01
I-75, I-275, and I-4, Wrong-way Detection Installation in Hillsborough, Pasco and Pinellas counties
430573-2, 430573-3
I-75/I-275 Collector-Distributor Roadway from SR 56 to south of County Line Road
447951-1-52-01
SR 39 Repaving from north of Central Avenue to US 301 (Gall Blvd.)
449316-1-52-01
SR 52 Pedestrian Overpass for the Suncoast Trail
449173-1-32-01
SR 52 Resurfacing From E. of Hicks Rd. to W. of Moon Lake Rd.
256334-1-52-01
SR 52 Widening from east of Ehren Cutoff to Old Pasco Road
256334-3-52-01
SR 52 Widening from east of Secretariat Road to east of Ehren Cutoff
256334-2-52-01
SR 52 Widening from east of US 41 (SR 45) to east of Secretariat Road
452004-1-52-01
SR 54 Paving from east of Crossing Boulevard to east of Aventura Boulevard
449315-1-52-01
SR 54 Pedestrian Overpass for the Suncoast Trail
443367-1-22-01
SR 56 Extension from US 301 to US 98
449169-1-52-01 & 449170-1-52-01
SR 56 Resurfacing from Bruce B. Downs Blvd. to Meadow Pointe Blvd. and SR 581 (Bruce B. Downs Blvd.) Resurfacing from SR 56 to SR 54
443707-1-32-01
US 19 (SR 55) Drainage Repair from north of Flora Avenue to south of Fivay Road
254677-2-52-94
US 19 (SR 55) Median Safety Improvements
447522-2-52-01
US 19 (SR 55) Pedestrian Safety Improvement from south of Tudor Lane to north of Tudor Lane
254677-6-09
US 19 Pedestrian Mid-Block Crosswalk at Charlene Lane in Pasco County
254677-6-23
US 19 Pedestrian Mid-Block Crosswalk at Louis Avenue in Pasco County
408075-2-52-01
US 301 (Gall Blvd) Widening from CR 54 (Eiland Blvd) to north of Kossik Rd
416564-2-52-01
US 301 (Gall Blvd) Widening from SR 56 to SR 39
455145-1-52-01
US 301 at Wire Road -- New Traffic Signal
255796-3-52-01
US 301 Reconstruction from Hillsborough/Pasco County Line to south of SR 56
256422-2-52-02
US 301 Widening and Realignment from SR 39 to south of CR 54
447536-2-52-01
US 301 Widening from south of US 98 to SR 50 (Cortez Blvd)
254677-6-07
US 41 (Land O’ Lakes Boulevard) New Traffic Signal at Lake Patience Road
458349-1-52-01
US 41 (SR 45) Intersection Improvements at SR 54
454840-1-52-01
US 41 (SR 45) Widening from north of SR 52 to south of CR 576
419182-1
US 41 at SR 54 Project Development & Environment (PD&E) Study
256423-3-52-01
US 98 (Dade City Bypass) Widening from 7th St. S. to 7th St. N.
451236-1-52-01
US 98 / US 301 Repaving from Long Avenue to US 98
443368-3-52-01
US 98 Widening and Realignment from the Polk County line to US 301