Project Details
Work Type Multi-Use Trail
Phase Completed
Limits From the end of Withlacoochee State Trail to the south end of Dunnellon Trail
City
County
Road
About

All work has been completed and the project was final-accepted from the contractor on March 2, 2022.

This project constructed a one-mile paved multi-use trail connecting the Withlacoochee State Trail to the Dunnellon Trail.  

The new trail includes a pedestrian crossing at US 41 near CR 39 in Citrus County. Based on public input, the crossing at US 41 was built as an underpass rather than an overpass. The underpass allows pedestrians and bicyclists to continue safely on an uninterrupted route between the Withlacoochee State Trail and the Dunnellon Trail.

_______________________________________________

Withlacoochee-Dunnellon Trail Connector Grand Opening 

Dunnellon, FL -- A grand opening ceremony for the completed Withlacoochee-Dunnellon Trail Connector took place Thursday morning, March 24, 2022.

The ceremony was held in the US 41 underpass of the new trail, immediately south of the CR 39 intersection. View the event photos in the Project Images section below.

_______________________________________________

Trail Connections: The Withlacoochee State Trail extends 46 miles from Citrus Springs to Dade City. It is a multi-use trail that spans Citrus, Hernando, and Pasco counties. The 2.5 mile Dunnellon Trail features a dramatic bridge over the Withlacoochee River. The Dunnellon Trail is designed as a connector to join the Cross Florida Greenway and the Withlacoochee State Trail. The Withlacoochee-Dunnellon Trail Connector provides the connectivity between these major trail systems.

View Factsheet
Contact Information
Media Contact
Kris Carson
813-975-6060
kristen.carson@dot.state.fl.us
Closures
  • There are no closures at this time.
Project Files
Project Videos
Project Images
Grand opening ceremony on March 24, 2022
Grand opening ceremony on March 24, 2022
Grand opening ceremony on March 24, 2022
Grand opening ceremony on March 24, 2022
Grand opening ceremony on March 24, 2022
Grand opening ceremony on March 24, 2022
Grand opening ceremony on March 24, 2022
Grand opening ceremony on March 24, 2022
Grand opening ceremony on March 24, 2022
Grand opening ceremony on March 24, 2022
Grand opening ceremony on March 24, 2022
Grand opening ceremony on March 24, 2022
Grand opening ceremony on March 24, 2022
Grand opening ceremony on March 24, 2022
Grand opening ceremony on March 24, 2022
Grand opening ceremony on March 24, 2022
Looking northwest at the trail underpass at US 41
Trail users coming out of the US 41 underpass on March 22, 2022.
Looking east at the approach to the US 41 underpass (3/22/2022 photo)
Enjoying the new trail west of the US 41 underpass on March 22, 2022.
Trail users heading east coming out of the US 41 underpass on March 22, 2022.
A pair cycling through the US 41 underpass on March 22, 2022.
Looking east from within the US 41 underpass on March 22, 2022.
Looking east towards the US 41 underpass (January 2022 photo)
Connection to the Dunnellon Trail (January 2022 photo)
Looking west towards the US 41 underpass (January 2022 photo)
Looking west towards the US 41 underpass (January 2022 photo)
A view within the trail underpass (January 2022 photo)
New pavement markings on the trail (January 2022 photo)
Crane lifting one of the final underpass segments into place on the east side of US 41 (photo 9/21/2021)
Workers prepare an underpass segment to be lifted by a crane (photo 9/21/2021)
Crane lifting one of the final underpass segments on the east side of US 41 (photo 9/21/2021)
Using a crane to lift the final pieces of the underpass into place (photo 9/21/2021)
Putting the final pieces of the underpass into place (photo 9/21/2021)
Putting the final pieces of the underpass into place (photo 9/21/2021)
Setting the final segments of the underpass into place (photo 9/21/2021)
Setting the final segments of the underpass into place (photo 9/21/2021)
Setting the final segments of the underpass into place (photo 9/21/2021)
Setting the final segments of the underpass into place (photo 9/21/2021)
Setting the last segment of the underpass into place (photo 9/21/2021)
The last segment of the underpass is in place (photo 9/21/2021)
Footers for the remaining segments to be installed (9/8/2021 photo)
Finishing the concrete footers for the remaining segments (9/8/2021 photo)
Pouring concrete for segment footers (9/8/2021 photo)
Installing reinforcing steel in footers for the remaining segments (9/7/2021 photo)
Handrail installed for safety along a portion of the new trail approaching the Dunnellon Trail (August 2021 photo)
Filling the area with dirt to eventually cover the underpass is nearing completion (August 2021 photo)
Grading nearing completion on the west side of the underpass (August 2021 photo)
The west side of the underpass is nearing completion (August 12, 2021 photo)
The west side of the underpass is nearing completion (August 12, 2021 photo)
Looking west to east through the underpass at US 41 (August 12, 2021 photo)
Trail construction west of US 41 (August 12, 2021 photo)
Inside the pedestrian underpass looking west (7/22/2021 photo)
Looking southwest at underpass construction; all but a few segments have been installed (7/22/2021 photo)
Looking northwest at segments that have been set for the pedestrian underpass (7/22/2021 photo)
A lot of underpass construction activity west of US 41 (7/22/2021 photo)
Looking north at construction on the west side of the underpass (7/22/2021 photo)
Retaining wall construction on the west side of the underpass (7/22/2021 photo)
Retaining wall construction on the west side of the underpass (7/22/2021 photo)
Looking from west to east at the pedestrian underpass under construction (7/22/2021 photo)
Looking from west to east at the pedestrian underpass under construction (7/22/2021 photo)
Filling the trench area where the underpass segments were placed (7/22/2021 photo)
Filling the trench area where the underpass segments were placed (7/22/2021 photo)
Filling the trench area where the underpass segments were placed (7/22/2021 photo)
Filling the trench area where the underpass segments were placed (7/22/2021 photo)
Dirt delivered to compact in the trench area where the underpass segments were placed (7/22/2021 photo)
Dirt delivered to compact in the trench area where the underpass segments were placed (7/22/2021 photo)
Looking along the new trail next to Delmane Drive towards Magenta Drive near the Withlacoochee State Trail Gulf Junction Trailhead (7/22/2021 photo)
New asphalt and concrete trail along Delmane Drive (7/22/2021 photo)
New asphalt and concrete trail along Delmane Drive (7/22/2021 photo)
Trail construction between the east end of W. Delmane Drive and US 41 (7/22/2021 photo)
Trail construction between the east end of W. Delmane Drive and US 41 (7/22/2021 photo)
Placing underpass precast steel-reinforced concrete arch segment (6/25/2021 photo)
All underpass precast concrete segments are installed (6/25/2021 photo)
Placing underpass precast steel-reinforced concrete arch segments (6/24/2021 photo)
Completed pedestal walls (6/18/2021 photo)
Placing concrete for pedestal walls (6/17/2021 photo)
Building framework for pedestal walls (6/17/2021 photo)
Building framework for pedestal walls (6/17/2021 photo)
Installing reinforcing steel for pedestal walls (6/16/2021 photo)
Placing concrete for footers that will support the underpass segments (6/11/2021 photo)
Finishing concrete for footers that will support the underpass segments (6/11/2021 photo)
Concrete has been placed for footers that will support the underpass segments (6/11/2021 photo)
Placing concrete for footers that will support the underpass segments (6/10/2021 photo)
Installing rebar for the concrete footer that will support the underpass segments (6/7/2021 photo)
Installing steel for the concrete footer that will support the underpass segments (6/3/2021 photo)
Installing steel and framework for the concrete footer that will support the underpass segments (6/3/2021 photo)
Placing fabric on the base for the footer that will support the underpass segments (6/1/2021 photo)
Building the base for the footer that will support the underpass segments (6/1/2021 photo)
Building the base for the footer that will support the underpass segments (6/1/2021 photo)
US 41 traffic was shifted to the new, temporary pavement on the east side in May to allow for construction of the pedestrian underpass.
US 41 traffic near W. Withlacoochee Trail was shifted to the new, temporary pavement on the east side in May to allow for construction of the pedestrian underpass.
Preparing the footer for the underpass (5/27/2021 photo)
Storm water drainage system installation (May 2021 photo)
Storm water drainage system installation (5/21/2021 photo)
Storm water drainage structure installation (5/20/2021 photo)
Storm water drainage structure installation (5/20/2021 photo)
Storm water drainage system installation (5/20/2021 photo)
Excavating for the pedestrian underpass (5/19/2021 photo)
Installing pavement markings to a temporary roadway where US 41 traffic will be shifted east of the existing alignment (5/10/2021 photo)
Preparing a temporary roadway to shift US 41 east of the existing alignment (5/10/2021 photo)
Storm water drainage installation (4/30/2021 photo)
Earthwork for new trail section (2/3/2021 photo)
Earthwork for new trail section (2/3/2021 photo)
Compacting soil around storm drain system (1/11/2021 photo)
Storm drain system (1/8/2021 photo)
Concrete just placed for gravity wall (1/8/2021 photo)
Concrete placement for gravity wall (1/8/2021 photo)
New concrete trail section (11/20/2020 photo)
Placing concrete for trail (11/19/2020 photo)
Public Open House October 14, 2019
Public Open House October 14, 2019
Public Open House October 14, 2019
Public Open House October 14, 2019
Public Open House October 14, 2019
Public Open House October 14, 2019
Public Open House October 14, 2019
Public Open House October 14, 2019