Citrus County All Current Projects
- 454461-1-52-01
- CR 39 (E Withlacoochee Trail) Repaving from N Big Bass Trail to west of E Tasha Court
- 441105-1-52-01
- Forest Ridge Blvd Safety Improvements From W Lake Beverly Dr to W Colbert Ct
- 454454-1-52-01
- SR 200 Bridge Replacement from E Spruce Drive to south of SW 137th Court
- 457613-1-52-01
- SR 44 (Gulf to Lake Highway) Resurfacing from W Homosassa Trail to N Central Avenue
- 450545-1-52-01
- U.S. 41 (S.R. 45) Pavement Reconstruction at S.R. 44
- 447928-1-52-01
- US 19 Resurfacing from north of NW 7th Ave to south of the Withlacoochee River bridge
- 437515-1-52-01
- US 19/US 98 (N Suncoast Boulevard) Repaving from south of NE 1st Terrace to south of Snug Harbor Road
- 254677-6-28
- US 41 (N Florida Avenue) Operational Freight Improvements at SR 200 (N Carl G Rose Highway) in Citrus County
- 450972-1-52-01
- US 41 (S Florida Avenue) Sidewalk Improvements from south of E Stage Coach Trail to south of E Tower Trail
- 257165-5-52-01
- US 41 Widening from N of Sportsman Point to E. Arlington Street
- 257165-4-52-01
- US 41 Widening From S of Withlacoochee Trail Bridge to N of Sportsman Point