US 19 New Interchanges between CR 95 and Pine Ridge Way S 433799-1-52-01
Project Details
Work Type | New Interchanges |
---|---|
Phase | Design |
Limits | From north of CR 95 to south of Pine Ridge Way S |
City | |
County | |
Road | |
Design Cost | $10.1 million |
About
The interchange and roadway improvement project will modify the existing six-lane divided highway to a six-lane controlled access roadway with one-way frontage roads in both directions parallel to US 19. New interchanges will be built at Tampa Road and Nebraska Avenue.
This project is currently in design. Construction is not funded at this time.