Work Type
Widening and Realignment
Phase
Design
Limits
From SR 39 to south of CR 54
Length
3 miles
City
County
Road

About

This project will widen US 301 from two lanes to a four lane divided roadway from SR 39 to Corey Street in Downtown Zephyrhills. Once built, the new roadway will connect to two new three lane one way roadways that parallel existing US 301 from Corey Street to CR 54.  Other improvements include the addition of bike lanes and sidewalks along both sides of the new roadways.  

In addition, a portion of SR 39 will be realigned and widened to a four-lane divided roadway at the south end of the project area.

This project is currently in design.  Construction is not funded at this time.   