US 301 Widening and Realignment from SR 39 to south of CR 54 256422-2-52-02
Project Details
Work Type | Widening and realignment |
---|---|
Phase | Design |
Limits | From SR 39 to south of CR 54 |
Length | 2.6 miles |
City | |
County | |
Road | |
Design Cost | $3.4 million |
ROW Cost | $26 million |
About
This project will widen US 301 from two lanes to a four lane divided roadway from SR 39 to Corey Street in Downtown Zephyrhills. Once built, the new roadway will connect to two new three lane one way roadways that parallel existing US 301 from Corey Street to CR 54. Other improvements include the addition of bike lanes and sidewalks along both sides of the new roadways.
In addition, a portion of SR 39 will be realigned and widened to a four-lane divided roadway at the south end of the project area.
This project is currently in design. Construction is not funded at this time.
View Factsheet
Contact Information
Design Manager |
---|
Mark Dunn
813-975-4248
Mark.Dunn@dot.state.fl.us
|
Media Contact |
Kris Carson
813-975-6060
Kristen.Carson@dot.state.fl.us
|
Closures
- There are no closures at this time.