Project Details
Work Type Reconstruction
Phase Design
Limits From east of East Rd. to Spring Time St.
Length 2.6 miles
City
County
Road
Design Cost $3.6M
ROW Cost $7M
About

This project will reconstruct CR 578 (County Line Road) from east of East Rd. to Spring Time St. from a two-lane road to a four-lane divided roadway along the border of Pasco and Hernando counties. A new sidewalk will be built on the north side and a shared-use path will be built on the south side of the road.

Right of way acquisition will be required for the roadway and drainage ponds.

The project is currently under design. Construction is not funded at this time.

View Factsheet
Contact Information
Design Manager
David Guttenplan
813-853-1026
David.Guttenplan@dot.state.fl.us
Media Contact
Kris Carson
813-975-6060
Kristen.Carson@dot.state.fl.us
Closures
  • There are no closures at this time.
Project Files