US 19 New Interchanges between Timberlane Road and Lake Street 433796-1-52-01
Project Details
Work Type | New Interchanges |
---|---|
Phase | Design |
Limits | From south of Timberlane Road to south of Lake Street |
City | |
County | |
Road | |
Design Cost | $6.2 million |
About
The interchange and roadway improvement project is modifying the existing six-lane divided highway to a six-lane controlled access roadway with one-way frontage roads in both directions parallel to US 19. New interchanges will be built at Klosterman Road and Mango Street.
*Design is currently on hold. Construction is not currently funded.
View Factsheet