Project Details
Work Type Widening
Phase Design
Limits from south of SR 56 to south of SR 39
Length 2 miles
City
County
Road
Design Cost $4M
ROW Cost $39.4M
About

This project will widen US 301 from two lanes to a four lane divided road with medians, bike lanes, a sidewalk on the east side and a shared use path on the west side.

Design is underway. Construction is not funded at this time.

 