EMERGENCY INFORMATION FDOT Emergency Travel Alert: For information on the current situation, please visit the following page - Alerts.

Project Details
Work Type Widening
Phase Design
Limits from SR 44 to south of the Withlacoochee Trail Bridge
Length 1 mile
City
County
Road
Design Cost $500,000
ROW Cost $19 million
About

Click to view the Virtual Open house Tour

This project will widen US 41 between SR 44 and the Withlacoochee Trail bridge from a two-lane roadway to a four-lane divided road with bike lanes and sidewalks. New traffic signals will be installed at the intersections of US 41 and Montgomery Ave. and US 41 and the Inverness Regional Mall.  

Design activities, including right-of-way acquisitions, are underway. Construction is anticipated to begin in 2023.

The improvements on this project include:

  • Add one lane in each direction
  • Add a median separation
  • Provide bicycle lanes adjacent to travel lane in each direction
  • Provide sidewalks on both sides
  • Provide a shared used path to connect sidewalks to the Withlacoochee State Trail (WST) at the north end of the project. The WST will not be impacted by this project.
  • Add lighting to all signalized intersections
  • Add a dedicated left turn lane for the southbound traffic to Inverness Middle School
View Factsheet
Contact Information
Design Manager
Eyra Cash
813-975-6164
Eyra.Cash@dot.state.fl.us
Media Contact
Kris Carson
813-975-6060
Kristen.carson@dot.state.fl.us
Closures
  • There are no closures at this time.
Project Files