Project Details

Work Type Arterial Traffic Management and New Highway Lighting
Phase Completed
Limits from Gunn Highway to Bruce B. Downs Blvd.
City
County
Road

About

The project was accepted from the contractor as completed on March 2, 2025

Construction is complete on this design-build project which added traffic signal controller upgrades along the SR 54/56 corridor including cameras, fiber optics, and other detection components between Gunn Highway in Odessa and Bruce B. Downs Boulevard in Wesley Chapel.

New highway lighting was also added at these two intersections: Crossings Boulevard and Oakstead Boulevard.

* Construction cost includes original construction contract amount plus approved contract changes. It does not include inspection oversite.

View Factsheet The link target will open in a new tab.

Contact Information

Media Contact
Kris Carson
813-975-6060
Kristen.carson@dot.state.fl.us

Project Images

New foundation for equipment
Lowering structure into place
Structure installed on foundation
Paving at the SR 54 and Oakstead Blvd. intersection
Traffic controller cabinet replacement
Installing conduit along eastbound SR 54 approaching Wesley Chapel Blvd. (8-15-2023 photo)
Installing conduit along eastbound SR 54 approaching Wesley Chapel Blvd. (8-15-2023 photo)
Conduit stockpile (July 2023 photo)
Conduit stockpile (July 2023 photo)
Looking northwest at construction now underway near the intersection of SR 54 and Collier Parkway (7-17-2023 photo)
Looking east along SR 54 at construction underway west of Collier Parkway (7-12-2023 photo)