US 41 Widening From S of Withlacoochee Trail Bridge to N of Sportsman Point 257165-4-52-01
Project Details
Work Type | Widening |
---|---|
Phase | Design |
Limits | From S of Withlacoochee Trail Bridge to N of Sportsman Point |
Length | .9 |
City | |
County | |
Road | |
Design Cost | $1.8M |
ROW Cost | $5.1M |
About
The purpose of this project is to reconstruct and widen US 41 from the existing 2 lanes to a 4-lane road with median separation. The project also includes bike lanes, sidewalks, new bridges over the Withlacoochee Trail, a mid-block pedestrian crossing, and new pond sites.
The project is currently in the design phase. Construction is anticipated to begin in Fall 2026.
View Factsheet
Contact Information
Design Manager |
---|
Eyra Cash
813-975-6164
Eyra.Cash@dot.state.fl.us
|
Media Contact |
Kris Carson
813-975-6060
Kristen.carson@dot.state.fl.us
|
Closures
- There are no closures at this time.