US 92 (4th St. N) Median Modifications from 30th Ave N. to 94th Ave N. 439401-1-52-01
Project Details
Work Type | Median Modifications |
---|---|
Phase | Design |
Limits | from 30th Ave N. to 94th Ave N. |
Length | 4 miles |
City | |
County | |
Road | |
Design Cost | $632,000 |
About
This project includes extending left turn lane storage at nine signalized intersections and 15 left turn lanes at existing median openings along the corridor. Some existing median openings will be modified and others will be closed. Additionally nine mid-block pedestrian crossings will be built.
The project is currently being designed. Construction is anticipated to begin in late 2022.
View Factsheet
Contact Information
Design Manager |
---|
Michael Ojo, PE.
813-975-6266
Michael.ojo@dot.state.fl.us
|
Media Contact |
Kris Carson
813-975-6060
Kristen.carson@dot.state.fl.us
|
Lane Closures
- There are no lane closures at this time.