Project Details
Work Type Resurfacing
Phase Construction
Limits from US 19 to east of NE 10th Ave.
Project Start November 7, 2022
Length 0.6 miles
City
County
Road
Construction Cost $3.1 million
Estimated Completion Summer 2023
Contractor C.W. Roberts Contracting, Incorporated
About

This project will repave SR 44 between US 19 and NE 10th Ave. in Crystal River.  Additionally, raised medians with dedicated left-turn lanes and mid-block pedestrian crossings will be added.  The bike lane widths will be increased to 5-feet. An 8-foot sidewalk will be added to the north side of the roadway and the existing sidewalk on the south side will be repaired and gaps will be filled in where there is available right of way.

The signalized intersection will be improved at US 19 and SR 44, and a new signal will be installed at SR 44 and NE 8th Avenue (Dr. Martin Luther King Jr. Avenue).

TRAFFIC SIGNAL UPDATE: The new signal at SR 44 and NE 8th Avenue (Dr. Martin Luther King Jr. Avenue) was put into operation on March 1, 2023. Crews will continue to monitor and adjust signal timings to provide the best flow possible for the traffic demands at different times of the day and night. Motorists are advised to be alert to the changed conditions at this intersection.

View Factsheet
Contact Information
Project Information
John McShaffrey
813-975-6930
roadwork@dot.state.fl.us
Media Contact
Kris Carson
813-975-6060
Kristen.Carson@dot.state.fl.us
Closures
  • US 19 at SR 44 and northbound US 19 ramp onto eastbound SR 44
    Lane closures: Sunday, March 19 through Thursday, March 23 nights from 7 p.m. to 7 a.m.

    SR 44 from 6th Avenue to 10th Avenue
    Day lane closures: Monday, March 20 through Friday, March 24 from 7 a.m. to 5 p.m.
    Night lane closures: Sunday, March 19 through Thursday, March 23 nights from 7 p.m. to 7 a.m.

Project Files