Project Details
Work Type Repaving
Phase Construction
Project Start November 13, 2023
City
County
Road
Construction Cost $13 million
Estimated Completion Summer 2025
Contractor Ajax Paving Industries of Florida LLC
About

Two projects have been combined to be built under one construction contract:

  • Repaving 3.25 miles on US 41 between County Line Road and Bell Lake Road (project 441659-1-52-01).  
  • Repaving 0.75 miles on SR 54 between US 41 and Knight Road (project 441658-1-52-01). 

The improvements in this project include milling and resurfacing, pavement reconstruction, pavement markings, drainage improvements, pedestrian / bicyclist enhancements, signage, and sidewalk repairs.

Project Update
Paving on US 41 was completed in May 2025. Milling and paving operations on SR 54 began in May 2025.

Underground Repairs
During the project, voids were discovered under SR 54 just east of the Lowe’s / Village Lake shopping center intersection. These voids required extensive remediation work that included grout being pumped into the voids under some of the SR 54 travel lanes. Lane closures were needed for this work during daytime hours and one extended Friday night closure. The work to repair the voids was completed on May 17, 2025.

View Factsheet
Contact Information
Project Information
John McShaffrey
813-975-6930
john.mcshaffrey@dot.state.fl.us
Media Contact
Kris Carson
813-975-6060
Kristen.carson@dot.state.fl.us
Closures
  • There are no closures at this time.
Project Files
Project Images
Looking north on northbound US 41 at new pavement and roadway markings (7-2-2025 photo)
New pavement and roadway markings on southbound US 41, south of Bell Lake Road (7-2-2025 photo)
New pavement and roadway markings on southbound US 41, north of Morgan Road (7-2-2025 photo)
Final paving is underway on US 41 south of SR 54 (4-28-2025 photo)
Work in the median of SR 54 with a single-lane closure on eastbound SR 54 (4-23-2025 photo)
Crews set up for the grouting operation on eastbound SR 54, east of US 41 (4-15-2025 photo)
A series of steel pipes are inserted into the roadway to allow grout to be pumped deep into the void (4-15-2025 photo)
A series of steel pipes are inserted into the roadway to allow grout to be pumped deep into the void (4-15-2025 photo)
A series of steel pipes are inserted into the roadway to allow grout to be pumped deep into the void (4-15-2025 photo)
A steel pipe is ready to receive the grout injection (4-15-2025 photo)
Grout is put into a hopper to be pumped to the injection point (4-15-2025 photo)
A hose is connected to the steel pipe to pump the grout into the ground (4-15-2025 photo)
During the grouting operations, surveying is done to ensure the roadway surface level does not change (4-15-2025 photo)
Gauges are used to monitor the pressure of the grouting operation (4-15-2025 photo)
While one truck offloads grout into a hopper, a second truck is ready when the first truck is empty (4-15-2025 photo)
Traffic merges from 3 lanes to one between US 41 and the work area on SR 54 (4-15-2025 photo)
Nighttime milling and resurfacing
Nighttime milling and resurfacing on northbound US 41, north of SR 54
New pavement and striping on southbound US 41 at SR 54 (5/2/2024 photo)
Lane closure set up for work on southbound US 41 approaching the south end of the project (11/30/2023 photo)
Lane closure set up for work on southbound US 41 approaching the south end of the project (11/30/2023 photo)