Work Type Repaving
Phase Design
Limits From west of Little Road to Marathon Drive
Length 3.4 miles
City
County
Road
Design Cost $1.6 million
About

This project will repave SR 54  between Little Road and Marathon Drive.  The existing sidewalk on the north side of SR 54 between Starkey Boulevard and Success Drive. and between Success Dr. and Marathon Drive will be widened to eight feet.

 Pedestrian features will be added at the Hospital Blvd intersection and a new mid block pedestrian crossing will be added east of Starkey Boulevard across SR 54. 

This project is currently in the design phase.  Construction is anticipated to begin in 2023.

View Factsheet
Contact Information
Design Manager
Bronoris Pye
813-975-6096
bronoris.pye@dot.state.fl.us
Media Contact
Kris Carson
813-975-6060
Kristen.Carson@dot.state.fl.us
Closures
  • There are no closures at this time.