Project Details
Work Type Repaving
Phase Design
Limits From north end of Skyway Bridge to south of Pinellas Point Dr.
Length 4.3 miles
City
County
Road
Design Cost $1.04 million
About

This project will repave travel lanes, shoulders ramps and frontage roads on I-275 between the Skyway Bridge and Pinellas Point Dr. The ramps and frontage roads at eh north rest area will also be repaved as part of this project. 

This project is currently in the design phase.

Construction is anticipated to begin in 2023.