EMERGENCY INFORMATION FDOT Emergency Travel Alert: For information on the current situation, please visit the following page - Alerts.

ACTIVE STATE OF EMERGENCY

As Florida continues to recover from Hurricane Helene, the Florida Department of Transportation (FDOT) is also actively monitoring Hurricane Milton.

Interstate lane closures and operations on active construction projects within the projected path of the storm have been suspended.

Contractors on these construction projects are currently securing work sites, clearing traffic control devices
that are not actively being used to direct traffic, and checking drainage systems.

Visit FloridaDisaster.org for the latest storm information and safety alerts.

For real-time traffic information throughout the state, visit FL511.com.

Project Details
Work Type Bridge Replacement
Phase Design
Limits between Pine Ridge Boulevard and Tarpon Woods Boulevard
Length 130 feet
County
Design Cost $950,000
About

This project will replace the existing bridge on Ridgemoor Boulevard between Pine Ridge Boulevard and Tarpon Woods Boulevard in Pinellas County. 

This project is currently in the design phase. Construction is anticipated to begin in 2025.

View Factsheet
Contact Information
Design Manager
Mark Dunn
813-975-4248
Mark.Dunn@dot.state.fl.us
Media Contact
Kris Carson
813-975-6060
Kristen.Carson@dot.state.fl.us
Closures
  • There are no closures at this time.
Project Files