Alt US 19 Repaving from Tampa Road to Meres Boulevard 448042-1-52-01
Project Details
Work Type | Repaving |
---|---|
Phase | Construction |
Limits | from Tampa Road to Meres Boulevard |
Project Start | January 7, 2025 |
Length | 5.4 miles |
City | |
County | |
Road | |
Construction Cost | $19.8 million |
Estimated Completion | Spring 2026 |
Contractor | Watson Civil Construction, Inc. |
About
This project is repaving ALT US 19 (Palm Harbor Boulevard/Pinellas Avenue) from south of Tampa Road to north of Meres Boulevard in Pinellas County.
In addition to roadway resurfacing, the project includes sidewalk and drainage upgrades, as well as signal improvements featuring the installation of a full traffic signal at Virginia Avenue.
Safety enhancements are also being added to include mid-block pedestrian crossings featuring Rectangular Rapid Flashing Beacons (RRFBs) at Columbia Avenue, Hidden Lake Drive, and Ketch Circle. Mid-block crossings with Pedestrian Hybrid Beacons (PHBs) will be installed to the north of Alderman Road, Brevard Street, Wai Lani Road, and Valley Road.
Construction activities are taking place during both daytime and nighttime hours. Any work requiring lane closures will occur from 7 p.m. to 7 a.m. Access to driveways, sidewalks, and side streets are being maintained throughout the duration of the project.
Motorists are reminded to use caution when driving through the work zone and to remain alert for pedestrians and construction workers.
The $19.8 million repaving project is expected to finish during spring 2026.
Please click on the following links, for information on how to use the Pedestrian Hybrid Beacon.
Contact Information
Project Information |
---|
Bryce Johns
727-575-8334
Bryce.Johns@dot.state.fl.us
|
Media Contact |
Kris Carson
813-975-6060
Kristen.Carson@dot.state.fl.us
|
Closures
-
ALT US 19 from Meres Boulevard to Tampa Road
Lane closures: Monday, September 22 through Friday, September 26 from 7 a.m. to 7 p.m.