Project Details
Work Type New Road Construction
Phase Design
Limits From South of County Line Road to SR 56
Length 3.2 miles
City
County
Road
Design Cost $8.3 million
About

This project will construct a 3-lane Southbound Collector-Distributor (CD) road system from the I-75/I-275 apex to the SR 56 southbound on-ramp to compliment Northbound CD road system in Wesley Chapel.

This includes:

  • A  new 2-lane Southbound on-ramp from the CD roadway to Southbound I-75 which will require widening the bridge over Cypress Creek.
  • A new bridge over Cypress Creek for the southbound CD roadway
  • A new fork of I-75/I-275 southbound
  • A new bridge of Southbound I-275 over the CD road ramp to Southbound I-75
  • New concrete barrier wall separation between I-75 Southbound mainline and the proposed Southbound CD roadway.
  • A proposed ramp from the Southbound CD roadway to Southbound I-75.

The project is currently in the design phase and has been combined with FPN 430573-3.

Construction is anticipated to begin in 2026.

View Factsheet
Contact Information
Design Manager
Dinyar Sharifabad
(813) 975-6172
Dinyar.Sharifabad@dot.state.fl.us
Media Contact
Kris Carson
(813) 975-6060
Kristen.Carson@dot.state.fl.us
Closures
  • There are no closures at this time.