I-75/I-275 Collector-Distributor Roadway from SR 56 to south of County Line Road 430573-2, 430573-3
Project Details
Work Type | New Road Construction |
---|---|
Phase | Design |
Limits | From south of County Line Road to SR 56 |
Length | 3.9 miles |
City | |
County | |
Road | |
Design Cost | $8.3 million |
About
This project will construct a 3-lane southbound Collector-Distributor (CD) road system from the SR 56 southbound on-ramp to the I-75 / I-275 apex to complement the northbound CD road system in Wesley Chapel.
This includes:
- A new 2-lane southbound on-ramp from the CD roadway to southbound I-75, which will require widening the bridge over Cypress Creek.
- A new bridge over Cypress Creek for the southbound CD roadway
- A new fork of I-75 / I-275 southbound
- A new bridge for southbound I-275 over the CD road ramp to southbound I-75
- New concrete barrier wall separation between the southbound I-75 mainline lanes and the proposed southbound CD roadway.
- A proposed ramp from the southbound CD roadway to southbound I-75.
The project is currently in the design phase and has been combined with FPN 430573-3.
Construction is not currently funded.
View Factsheet
Contact Information
Design Manager |
---|
Dinyar Sharifabad
(813) 975-6172
Dinyar.Sharifabad@dot.state.fl.us
|
Media Contact |
Kris Carson
(813) 975-6060
Kristen.Carson@dot.state.fl.us
|
Closures
- There are no closures at this time.