Launch Recite Me assistive technology

EMERGENCY INFORMATION FDOT Emergency Travel Alert: For information on the current situation, please visit the following page - Alerts.

Florida Department of
TRANSPORTATION

Project Details

Work Type
Truck Parking Facility
Phase
Construction
Project Start
September 20, 2025
City
County
Road
Construction Cost
$29.4 million
Estimated Completion
Late 2026
Contractor
Ajax Paving Industries of Florida, LLC

About

The FDOT is constructing a new I-4 Truck Parking Facility at the southwest corner of the I-4 and County Line Road interchange in Hillsborough County. 

The new I-4 Truck Parking Facility is being built on a 49-acre FDOT-owned site and will provide 160 truck parking spaces.

The new facility will be integrated into Florida’s Truck Parking Availability System (TPAS) to provide drivers with real-time parking availability information via a mobile application and dynamic roadside signs.

Improvements include:

  • Replacing the traffic signal and providing dual right and left turn lanes from the eastbound I-4 exit ramp onto County Line Road.
  • Adding a traffic signal and providing dual right and left turn lanes from the westbound I-4 exit ramp onto County Line Road.
  • Reducing the radii and adding truck aprons to accommodate trucks.
  • Modifying traffic signals and reconfiguring travel lanes along County Line Road to reduce truck delays and improve mobility.
  • Installing new signage and pavement markings, highway lighting, and ITS systems.
  • Installing a 175-foot pole, displaying an 80 x 50-foot American flag and a 30 x 20-foot state of Florida flag 

Construction activities on the $29.4 million project are expected to finish in late 2026.

************************************************************************

What is design-build? Design-build is a method of project delivery in which one entity - the design-build team - works under a single contract with the FDOT (or any owner) to fully design and construct a project.  The contract work covers from initial design through construction completion.  This contract type typically allows for faster construction of a project as design and construction can be on-going simultaneously. 

View Factsheet The link target will open in a new tab.

Contact Information

Closures

  • Eastbound I-4 Ramp (Exit 25) from County Line Road Closing Monday Night

    Plant City, FL – The eastbound I-4 ramp (Exit 25) from County Line Road will close from 8 p.m., Monday, September 21, to 6 a.m., Tuesday, September 22, weather permitting.

    Motorists needing to access eastbound I-4 will have to continue north on County Line, turn left onto Swindell Road, turn left onto North Frontage Road, then turn left onto Park Road, and proceed onto the eastbound I-4 entrance ramp.

    Motorists are reminded to slow down, stay alert, and drive safely through the work zone.

    This closure is needed for final paving of the eastbound I-4 entrance ramp from County Line Road in Hillsborough County.

    For more information on this project, please visit FDOT Tampa Bay.

Project Files

Project Images