EMERGENCY INFORMATION FDOT Emergency Travel Alert: For information on the current situation, please visit the following page - Alerts.

ACTIVE STATE OF EMERGENCY

As Florida continues to recover from Hurricane Helene, the Florida Department of Transportation (FDOT) is also actively monitoring Hurricane Milton.

Interstate lane closures and operations on active construction projects within the projected path of the storm have been suspended.

Contractors on these construction projects are currently securing work sites, clearing traffic control devices
that are not actively being used to direct traffic, and checking drainage systems.

Visit FloridaDisaster.org for the latest storm information and safety alerts.

For real-time traffic information throughout the state, visit FL511.com.

Project Details
Work Type PD & E Study
Phase Study
Limits US-301 from Fowler Ave to State Road 56
Length 13.1 Miles
County
Road
About

The purpose of this project is to provide additional roadway capacity and improve safety on this portion of US 301 in unincorporated Hillsborough and Pasco Counties.

US 301 is a major north-south roadway used for travel through Hillsborough and Pasco counties and provides access to many of the area’s major roadways, including I-4, SR 39, SR 54 and SR 52.

The US 301 corridor is a vital roadway within the Tampa Bay area and serves as an emergency evacuation route.

Additional Information
FDOT D7 Studies:
US 301 Project Development and Environment (PD&E) Study
https://active.fdotd7studies.com/us301/fowler-to-sr56/

View Factsheet
Contact Information
Study Manager
Amber Russo
(813) 975-6260
Amber.Russo@dot.state.fl.us
Media Contact
Kris Carson
(813) 975-6060
Kristen.Carson@dot.state.fl.us
Closures
  • There are no closures at this time.