St. Petersburg Design Projects
- 437805-1-52-01
- I-275 and US 19 Highway Lighting Upgrades in Pinellas County
- 454172-1-52-01
- I-275 Pavement Rehabilitation from north of I-375 to north of 38th Avenue North
- 449153-1-52-01
- I-275 Repaving from north of Maximo Point Bridges to south of 54th Avenue S
- 424501-7-52-01
- I-275 Widening from 54th Avenue S to I-375
- 449109-2-52-01
- I-275 Widening from I-375 to 38th Avenue
- 447236-1-52-01
- S.R. 686 (Roosevelt Boulevard) Pavement Reconstruction at 28th Street
- 440247-1-52-01
- SR 686 (Roosevelt Boulevard) Repaving from US 19 to Lightwave Drive
- 456312-2-52-01
- SR 699 (Gulf Boulevard) Repairs from SR 682 (Pinellas Bayway) to SR 688 (Walsingham Road)
- 447919-1
- US 92 (4th Street N) Repaving from 3rd Street N to 30th Avenue N
- 451238-1-52-01
- US 92 (Gandy Boulevard) Resurfacing from Brighton Bay Boulevard to Gandy Bridge