EMERGENCY INFORMATION FDOT Emergency Travel Alert: For information on the current situation, please visit the following page - Alerts.

ACTIVE STATE OF EMERGENCY

As Florida continues to recover from Hurricane Helene, the Florida Department of Transportation (FDOT) is also actively monitoring Hurricane Milton.

Interstate lane closures and operations on active construction projects within the projected path of the storm have been suspended.

Contractors on these construction projects are currently securing work sites, clearing traffic control devices
that are not actively being used to direct traffic, and checking drainage systems.

Visit FloridaDisaster.org for the latest storm information and safety alerts.

For real-time traffic information throughout the state, visit FL511.com.

Project Details
Work Type Widening
Phase Design
Limits From North of I-375 to North of 38th Avenue North
Length 2 miles
City
County
Road
Design Cost $9.7 million
About

This project will widen I-275 between I-375 to 38th Avenue N. to provide two tolled express lanes in each direction. This project will also include lane continuity and operational improvements. The roadway and bridges will be widened and noise walls will be built. 

This project is currently in the design phase. Construction is not currently funded.

View Factsheet
Contact Information
Design Manager
Helena Ly
813-975-3690
helena.ly@dot.state.fl.us
Media Contact
Kris Carson
813-975-6060
Kristen.Carson@dot.state.fl.us
Closures
  • There are no closures at this time.