SR 679 (Bayway Bridge-Structure E) Replacement and Repaving from north of Yacht Club Lane to SR 682 410755-2-52-01
Project Details
Work Type | Bridge Replacement and Repaving |
---|---|
Phase | Construction |
Limits | From north of Yacht Club Lane to SR 682 |
Project Start | December 2018 |
Length | 2 miles |
City | |
County | |
Road | |
Construction Cost | $56.8 million |
Estimated Completion | Spring 2022 |
Contractor | American Bridge Company |
About
The design-build project includes replacing the existing two-lane bascule bridge with a two-lane, high-level, fixed bridge (Bayway Structure "E," which is the bridge between Isla Del Sol and Tierra Verde islands), repaving the existing SR 679 roadway between SR 682 and the new bridge, and replacing a seawall south of the bridge along SR 679 in Pinellas County.
The project will also include the construction of a 12-foot-wide shared-use path on the east side and a 5-foot-wide concrete sidewalk on the west side of SR 679. Other improvements include the addition of a round-about at Madonna Boulevard / 1st Street.
- Three projects; 410755-2, 427143-2, 432587-1 have been combined into a single design-build project. This page will serve as the source of information for the entire design-build effort.
The $56.8 million design-build project is expected to finish in 2022.
Contact Information
Construction Manager |
---|
Scott Guthrie
727-575-8300
scott.guthrie@dot.state.fl.us
|
Media Contact |
Kris Carson
813-975-6060
Kristen.Carson@dot.state.fl.us
|
Lane Closures
- There are no lane closures at this time.